Laserfiche WebLink
. ^ <br /> MONITORING PLAN: <br /> (SEC 2632) E 1-2 <br /> U.ST . LAW REGULATIONS <br /> ======================================================================= <br /> 1 . DAILY TEST OF SYSTEM <br /> 2. EMCO WHEATON MONITOR WITH PROBE IN EACH OF THREE, ANNULAR <br /> TANK SPACES AND PROBE IN EACH OF THREE PIPE SUMPS LOCATED IN <br /> MANWAYS NEXT TO DISPENSORS . <br /> PROBES ARE LIQUID SENSOR TYPE SET JUST OFF BOTTOM OF TANK AND SUMP <br /> FLOOR <br /> 3 . WILL CONTACT SHAW'S MAINTANCE OR TOHER FIRM TO [0 ANNUAL <br /> INSPECTION TO COMPLY . <br /> REPORTING FORMAT : <br /> IF FAILURE OCCURS , SYSTEM CHECK WILL BE DUE . <br /> IF REPAIR IS NEEDED REPAIR COMPANY .i .e . SHAW'S MAINTANCE WILL <br /> BE CONTACTED TO DETERMINE IF PROBLEM IS DUE TO SYSTEM FAILURE <br /> OR LEAK IS DETECTED . <br /> IF SYSTEM HAS FAILED REPAIRS WILL BE MADE AND ENTRY IN LOG <br /> BOOK WILL BE MADE . <br /> IF LEAK IS CAUSE OF TROUBLE , ENVIRONMENTAL HEALTH DEPT WILL <br /> BE NOTIFIED , PRODUCT WILL BE REMOVED FROM PROSPECTIVE TANK <br /> OR PIPING UNTIL REPAIRS CAN BE COMPLETED . <br /> ENTRY IN LOG BOOK WILL BE MADE DESCRIBING PROBLEM. <br /> PREVENTITIVE MAINTANCE SCHEDULE <br /> AT LEAST ANNUAL MAINTANCE TEST WILL BE DONE OR IF PROBLEM <br /> . ARRISED SOONER BY MAINTANCE FIRM i .e . SHAW'S MAINTANCE <br /> TRAINING: <br /> WILL BE DONE BY SHAW'S FOR MANAGEMENT AND MANAGEMENT WILL <br /> TRAIN EMPLOYEES . <br />