My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:57:00 PM
Creation date
2/19/2020 11:53:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.-Tank Gauging/SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Cojpn plete the foliowin checklist: <br /> es I ❑ No* I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> 21 es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> es ❑ No* Was accuracy of system product level readings tested? <br /> EfXes ❑ No* Was accuracy of system water level readings tested? <br /> es ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the follow checklist: <br /> ❑ Yes ❑ No* Fore i ment start-up or annual equipment certification, was a leak si ated to ver�fy LLD performance? <br /> ❑ N/A (Check a t apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confer operational and accurate within reg4fratory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus pro I calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs, does the LL trict pro ct flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine omatic shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does t turbine automatically shut if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LL , does the turbine automatically shut off if any po of the monitoring system malfunctions <br /> Ll N/A or fails a test <br /> ❑ Yes ❑ No* For ele nic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Vere all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.