Laserfiche WebLink
.-Tank Gauging/SIR Equipment: Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Cojpn plete the foliowin checklist: <br /> es I ❑ No* I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> 21 es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> es ❑ No* Was accuracy of system product level readings tested? <br /> EfXes ❑ No* Was accuracy of system water level readings tested? <br /> es ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the follow checklist: <br /> ❑ Yes ❑ No* Fore i ment start-up or annual equipment certification, was a leak si ated to ver�fy LLD performance? <br /> ❑ N/A (Check a t apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; 0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confer operational and accurate within reg4fratory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus pro I calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs, does the LL trict pro ct flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine omatic shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does t turbine automatically shut if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LL , does the turbine automatically shut off if any po of the monitoring system malfunctions <br /> Ll N/A or fails a test <br /> ❑ Yes ❑ No* For ele nic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Vere all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />