My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:57:00 PM
Creation date
2/19/2020 11:53:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPACITY 10000 g PRECISION UNDERGROUNI) TANK TESTING RESULTS Patent Pending <br /> TANK # Regular PAGE 5 <br /> STAT # N/A TEST PROCEDURES <br /> TEST DATE : 10/23/89 Copyright 1985 <br /> NDE TECHNOLOGY, INC . PROPRIETARY <br /> 1 . Piping Pressure Test - N/A <br /> 2 . Pneumatic Pressure Data <br /> Amount of pressure applied <br /> to system: N/A <br /> 3 . Amount of pressure drop if any: N/A <br /> -4 . Amount of time elapsed during the test N/A <br /> 5 . Piping Pressure Test Leak Rate is N/A <br /> If computer is used see computer printout of leakage rate and all <br /> test parameters on Test Results , Part IV , Page 11 , 12 <br /> Test results of storage systems that utilize pressurized piping <br /> systems will not be recognized unless the turbine pump is <br /> activated after the completion of a successful system test. <br /> 6. Was turbine pump activated? N/A <br /> 7 . Pressure piping systems shall be tested under actual operating <br /> pressures , and statement describing results must be included. <br /> SF�e #1 Above <br /> 8. If applicable, has the isolation procedure in addition to the <br /> product line been completed? N/A <br /> NDE TECHNOLOGY, INC . PROPRIETARY <br /> WATT INC . 3131 FAIRHAVEN DRIVE , BAKERSFIELD , CA 93308 (805) 322-9827 <br />
The URL can be used to link to this page
Your browser does not support the video tag.