Laserfiche WebLink
Apr 18 03 06: 52p Fr zen Hill 559F-81467 <br /> Page 7 of 7 <br /> SWRCB,January 2002 <br /> Express Manteca <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equi ped With S ilUOverfill Containment Boxes — --- -- <br /> SpilUOverfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry StandardProfessional Engineer <br /> Other(Specify) --- <br /> Test Method Used: pressure <br /> Vacuum Hydrostatic <br /> Other(Specify) —.�---- <br /> Test Equipment Used: Equipment f;M]i.rtion: <br /> �� <br /> Spilt Box# Spill Box# Spin F. # Spill Box <br /> ff <br /> Bucket Diameter: - <br /> Bucket Depth: — --wait time time between applying <br /> pressure/vacuum/water and I - <br /> starting test: — -- <br /> Test Start Time: — -- <br /> Initial Reading(Ro- — <br /> Test End Time: —- - <br /> Final Reading(RF): `- <br /> Test Duration: -- -- <br /> Change in Reading(RF-RO: <br /> Pass/Fail Threshold or <br /> Criteria: -- <br /> Test Result: Pass Fail Pass Fail Pais 1~ail Pass Fsi"• <br /> Com-meats (include information on repairs made prior to testing and recommended u fol'on.- forfciiled tests) <br /> Signature of Company Representative <br /> Date: _— <br />