My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:57:00 PM
Creation date
2/19/2020 11:53:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apr 18 03 06: 52p Fr zen Hill 559F-81467 <br /> Page 7 of 7 <br /> SWRCB,January 2002 <br /> Express Manteca <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equi ped With S ilUOverfill Containment Boxes — --- -- <br /> SpilUOverfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry StandardProfessional Engineer <br /> Other(Specify) --- <br /> Test Method Used: pressure <br /> Vacuum Hydrostatic <br /> Other(Specify) —.�---- <br /> Test Equipment Used: Equipment f;M]i.rtion: <br /> �� <br /> Spilt Box# Spill Box# Spin F. # Spill Box <br /> ff <br /> Bucket Diameter: - <br /> Bucket Depth: — --wait time time between applying <br /> pressure/vacuum/water and I - <br /> starting test: — -- <br /> Test Start Time: — -- <br /> Initial Reading(Ro- — <br /> Test End Time: —- - <br /> Final Reading(RF): `- <br /> Test Duration: -- -- <br /> Change in Reading(RF-RO: <br /> Pass/Fail Threshold or <br /> Criteria: -- <br /> Test Result: Pass Fail Pass Fail Pais 1~ail Pass Fsi"• <br /> Com-meats (include information on repairs made prior to testing and recommended u fol'on.- forfciiled tests) <br /> Signature of Company Representative <br /> Date: _— <br />
The URL can be used to link to this page
Your browser does not support the video tag.