Laserfiche WebLink
12/24/2002 12:33 209577PPAO BOYETT PETROLEUM PAGE 12 <br /> WRITTEN MONITORING PROCEDURES.FORM <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions oFthc operating permit,The permit holder must notify the local aQLctjcy)within 30 days of any changes to the <br /> monitoring procedures,unless required to obtain approval before making the change, <br /> Required by Sections 2632(4)and 2641(h)CCR <br /> Facility Name: -b <br /> Facility Address: ' // at, & \s�-- <br /> A- Indicate the frequency of monitoring: <br /> Tank: 0--4vt-r`7 �LS ' 3 (/P�-GL2. X-C-T ) <br /> Piping: <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tanks: <br /> Piping: - <br /> C. Describe the location(s) where the monitoring wiII be performed(facility plot plait <br /> should be attached): <br /> D. List the name(s) and title(s) of the person responsible for monitoring and/or <br /> maintaining the. quipment: <br /> E. Reporting format f r monitonn <br /> Tank: ` 2 r <br /> Piping: <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. <br /> Note: Maintenance must be in accordance with the Manufacturer's maintenance <br /> schedule but not Jess than every 12 months. <br /> G. Describe the training necessary for the operation of UST system, including piping and <br /> monitoring a uipment. <br /> t.6 �.7 a <br />