My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985 - 2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_1985 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:57:00 PM
Creation date
2/19/2020 11:53:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985 - 2004
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/24/2002 12:33 209577PPAO BOYETT PETROLEUM PAGE 12 <br /> WRITTEN MONITORING PROCEDURES.FORM <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions oFthc operating permit,The permit holder must notify the local aQLctjcy)within 30 days of any changes to the <br /> monitoring procedures,unless required to obtain approval before making the change, <br /> Required by Sections 2632(4)and 2641(h)CCR <br /> Facility Name: -b <br /> Facility Address: ' // at, & \s�-- <br /> A- Indicate the frequency of monitoring: <br /> Tank: 0--4vt-r`7 �LS ' 3 (/P�-GL2. X-C-T ) <br /> Piping: <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tanks: <br /> Piping: - <br /> C. Describe the location(s) where the monitoring wiII be performed(facility plot plait <br /> should be attached): <br /> D. List the name(s) and title(s) of the person responsible for monitoring and/or <br /> maintaining the. quipment: <br /> E. Reporting format f r monitonn <br /> Tank: ` 2 r <br /> Piping: <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. <br /> Note: Maintenance must be in accordance with the Manufacturer's maintenance <br /> schedule but not Jess than every 12 months. <br /> G. Describe the training necessary for the operation of UST system, including piping and <br /> monitoring a uipment. <br /> t.6 �.7 a <br />
The URL can be used to link to this page
Your browser does not support the video tag.