Laserfiche WebLink
Site Organization Chart <br /> Chevron PM <br /> Scott Mansholt <br /> 925-842-1804 <br /> (office) <br /> 925-548-0540 <br /> SAIC PM <br /> Jeff White <br /> 510-466-7178 <br /> (office) <br /> 510-387-2267 <br /> (mobile) <br /> Subcontractor <br /> Manager <br /> Site H&S Officer Field Manager Tuan Ngyuen—RSI <br /> Mike Rogers—Flash <br /> (Larry Silva) (Larry Silva) Safety <br /> Denise Cruz—Cruz <br /> Brothers <br /> Job Descriptions: <br /> SAIC Project Manager: The Project Manager directs the total efforts of the project and is responsible for <br /> ensuring conformance with the project work plan, HASP, and SAIC, CEMC, and, regulatory policies and <br /> procedures. Ensure that work is planned, and that responsibility and authority are assigned for <br /> performance of individual tasks <br /> SAIC Field Manager: The Site Supervisor will oversee the field activities associated with the project and <br /> will be responsible for site accessibility and safety. The SHSO is responsible for enforcing the field <br /> requirements of this HASP and reports to the Project manager. <br /> SAIC Site Health and Safety Officer: The Site Health and Safety Officer (SHSO) will oversee the field <br /> activities associated with the project and will be responsible for site accessibility and safety. The SHSO is <br /> responsible for enforcing the field requirements of this HASP and reports to the field manager. 'Site H&S <br /> Officer/ Field Manager: (potentially the same person on some sites) are responsible for identifying jobsite <br /> hazards and ensuring the JSA requirements are in place and followed by all field personnel. <br /> Subcontractor Manager: Ensure that all their staff is fully trained to meet Chevron, SAIC and regulatory <br /> training requirements and can ensure that all equipment meets the requirements of the SOW and is <br /> sufficient to complete the job safely and efficiently. <br /> Change of Personnel <br /> In the event that any of the project team members presented in the Site Organization Chart must <br /> be changed, such changes will be conducted as outlined in the Chevron Management of Change <br /> (MOC) Process and SAIC Procedure FTP- 1220 (Documenting and Controlling Field Changes to <br /> Approved Work plans). <br /> 10 SAIC <br />