Soil Suitability and Nitrate Loading Evaluation CTE Job # 25-0710 <br /> Great Pacific Nut—Nut Processing Facility Expansion <br /> 3501 Lehman Road <br /> Tracy, California <br /> Aufzust 1, 2019 Page 5 of 10 <br /> fine textured, nearly level soil in interfan basins. Septic tank absorption field rating for Capay <br /> soils is indicated to be "very limited" due to ponding and slow water movement. Based on <br /> published geologic mapping --"Geologic Map of the San Francisco-San Jose Quadrangle" (CDMG <br /> Map Sheet 5A, 1991) the site is indicated to be underlain by the Quaternary Alluvial Fan deposits. <br /> The percolation test holes (P-1X & P-1) encountered soil profiles of stiff medium plastic clay (CL) <br /> to maximum depth of 36 inches in test hole P-IX. Test P-1 encountered low plastic clay (CL) to <br /> 30-inches bgs and fine sandy silt (ML) from 30 to 38-inches bgs. Soils encountered with Boring- <br /> GW included stiff low plastic clay (CL) to 4 feet bgs, medium dense to dense silty sand (SM) <br /> between 4 and 20 feet bgs and stiff clayey silt (ML) from 20 feet bgs to the maximum explored <br /> depth of 25 feet bgs. <br /> The soil material type presented on the percolation test data sheets represents the soil material type <br /> present at the depth in which the percolation testing was conducted. Percolation data sheets are <br /> contained in Appendix-A. Locations of the percolation tests are shown on the attached <br /> "Exploration Location Map" (Figure-2). All test holes were backfilled to with cement grout and <br /> surface restored to original condition upon completion of testing. <br /> 7.0 PERCOLATION TESTING <br /> Our subsurface investigation included conducting leach field soil suitability evaluations via <br /> percolation testing. The evaluation included the drilling and testing of two percolation test holes at <br /> the locations shown on Figure-2. The percolati n test ere conducted at the proposed leach field <br /> location at a depth of 36-inches (P-1 ) and 38-inches (P-1).`-7 <br /> 7.1 Percolation Testing Procedure I R <br /> Upon completion of the percolation test hole drilling, loose material was removed and a 3-inch <br /> diameter open-ended slotted drain pipe was installed to control potential sidewall caving of the <br /> hole. Pre-saturation of the soils to be tested was accomplished by adding water to 12-inches above <br /> the base each test hole at least 24 hours preceding the test. After the 24 hour (minimum) pre- <br /> " <br /> re- <br /> Cz1.L,INC. <br />