My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GUARD
>
13750
>
2900 - Site Mitigation Program
>
PR0527319
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:05:36 PM
Creation date
2/19/2020 2:14:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527319
PE
2950
FACILITY_ID
FA0018496
FACILITY_NAME
A G SPANOS CO
STREET_NUMBER
13750
Direction
N
STREET_NAME
GUARD
STREET_TYPE
RD
City
THORNTON
Zip
95242
APN
05508003
CURRENT_STATUS
01
SITE_LOCATION
13750 N GUARD RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Description <br /> March 12, 2009 <br /> Subject: Installing 3 piezometers for groundwater depth readings <br /> Depth: to 15 feet below ground surface <br /> Site: Shin Kee Tract <br /> Location: 13750 North Guard Avenue, Thornton, CA <br /> Kleinfelder is planning on installing three piezometers near the northern <br /> boundary of Shin Kee Tract located south of Highway 12 near Thornton, <br /> California. The 15-foot-deep piezometers will be drilled using a Simco 2400 or <br /> CME-75 truck mounted drill rig with continuous, 6-inch diameter, solid-stem or <br /> hollow-stem auger. We will use 2-inch diameter PVC-pipes for casing. The pipes <br /> in the upper 5 feet are going to be solid pipes while the rest are perforated. <br /> Around the pipes in the.bottom 11 feet will be filled with sand and 2 feet of <br /> bentonite above the sand. The upper 2 feet, around the solid pipe, will be <br /> grouted. Upon the completion of our readings in approximately 12 months, the <br /> holes will be destructed and grouted with neat cement under the supervision of a <br /> county representative. <br /> Thank you <br /> Hamid "Saeed" Parsa, PE <br /> Staff Engineer <br /> Kleinfelder West, Inc. <br /> Attachment: Site Map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.