Laserfiche WebLink
06/o31'99 16:40 FAX 510 113 0344 QST MARTINEZ 1Z003,'007 <br /> Mr.Jeff Wong <br /> June 3, 1999 <br /> Page 2 <br /> Iylonito Vsle]<l Installation: The well will be installed in accordance with industry accepted practices <br /> and subject to state and local requirements for unconsolidated monitor well con=uction. The <br /> monitor well will be h)stalled by an experience monitor well driller, under the direct supervision of <br /> a QST geologist. Drilling in the overburden aquif' r will be performed through the use of 4 1/4-inch <br /> hollow stern augers to facilitate the installation of the well. <br /> The boring for the well will be continuously sampled at two foot increments over the entire depth <br /> with a 2-inch outer diameter split spoon sampler. The split spoons will be collected at two foot <br /> increments in each well boring by driving the split spoon,ahead of the borehole into undisturbed soil <br /> using a.140-pound hau=cr with an average fall of 30 inches. Once the desired depth is reached,the <br /> split spoon will be advanced by the drill rig as per ASTM 4D1586-94. Upon retrieval, the split <br /> spoon will be opened, soil samples will be visually classified and field screened with a photo <br /> ionization detector(PID)to identify potential contamination_ <br /> Soil samples will be collected from the increment containing the highest PID reading and from the <br /> increment at the top of the water table(interface of the vadose zone and saturated soil). Collected <br /> samples will be placed in the appropriate containers for the specific analysis, and placed into the <br /> sample shuttle at 4 degrees C for transport to the laboratory. The selected soil samples will be <br /> analyzed is accordance with Method 8260B for carbon t:tnauWvride, carbon disulfide and <br /> chloroform. <br /> The well will be in;,-talled with 2-inch diameter, Schedule 40,FVC riser and 10 feet of 0.010 inch <br /> slot, Schedule 40, PVC well screen. The riser and screen will be capped on both ends. Only <br /> threaded joints will be used for the well casing. Sand pack around the annular space of the screen <br /> will be the appropriate size sand based on the screen slot size. <br /> The sand will extend one foot above the screen. A.two foot hydrated bentonite pellet seal will be <br /> placed over the sand. Soil cuttings generated during the drilling will be drummed, labeled and <br /> placed in a designated location at the facility for proper disposal by the CLIENT_ <br /> Nell development will be performed for a period of one hour through low yield sustained pumping, <br /> or until the sediment fines are removed from the discharge water and pH and specific conductance <br /> of the water has stabilized. Development water will be drwiamed, labeled and placed in a designated <br /> location at the facility for proper disposal by the CLIENT. <br /> QLQM xd2Wkg Quality Evaluation:The ground water sampling wmponent consists of the collection <br /> of a groundwater quality sample from the newly installed well at the site. <br />