My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
2705
>
2900 - Site Mitigation Program
>
PR0545254
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 2:24:57 PM
Creation date
2/20/2020 1:11:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545254
PE
2965
FACILITY_ID
FA0025731
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2705
STREET_NAME
HARBOR
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
2705 HARBOR ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT "B" -3- <br /> APPLICATION RQUIREMENTS <br /> GENERAL ORDER FOR <br /> STOCKTON DEEP WATER SHIP CHANNEL'S <br /> MAINTENANCE DREDGING ACTIVITIES <br /> 2. Site Operation Plan which must include the following: <br /> a. Description of dredge material handling equipment, <br /> b. Procedures to be followed for decanting liquids from dredged sediments, <br /> C. To scale site Plan showing the following: <br /> (1) North arrow and scale <br /> (2) Location of sediment pond(s) and sediment receiving unit(s), <br /> (3) Sediment pond overflow structure locations, <br /> (4) Location and diameter of river outfall pipe for dredge return waters, <br /> (5) Sampling points in sedimentation ponds and return flow receiving water <br /> monitoring points in San Joaquin River, <br /> (6) Locations where Best Management Practices will be applied to prevent <br /> erosion, <br /> (7) Pre-disposal topographical contours across the site, tied to Mean Sea <br /> Level (MSL), <br /> (8) High and low water river elevations adjacent the DMD tied to MSL. <br /> 3. Additional DMD site information <br /> a. Liquid Mass balance for sedimentation pond(s), <br /> b. Volume of each sedimentation pond, <br /> C. Calculations and analyses for determining minimum holding times required for <br /> dredge materials before decanting liquids to the river. <br />
The URL can be used to link to this page
Your browser does not support the video tag.