My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARBOR
>
2705
>
2900 - Site Mitigation Program
>
PR0545254
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 2:24:57 PM
Creation date
2/20/2020 1:11:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545254
PE
2965
FACILITY_ID
FA0025731
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2705
STREET_NAME
HARBOR
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502005
CURRENT_STATUS
02
SITE_LOCATION
2705 HARBOR ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO.R5-2003-0165 -3- <br /> SUPPORT <br /> 3- <br /> SUPPORT TERMINALS OPERATING PARTNERSHIP,LP <br /> STOCKTON TERMINAL <br /> ENHANCED BIOREMEDIATION PILOT STUDY <br /> SAN JOAQUIN COUNTY <br /> 3. Cumulative data tables containing the water quality analytical results and depth to <br /> groundwater; <br /> 4. An evaluation of the performance of the bioremediation pilot study including an analysis of <br /> its effectiveness in destroying the pollutants, and a discussion of the potential for field scale <br /> application; <br /> 5. A discussion of compliance and the corrective action taken, if any, as well as any planned or <br /> proposed actions needed to bring the discharge into full compliance with the waste discharge <br /> requirements; and <br /> 6. A discussion of any data gaps, potential deficiencies/redundancies in the monitoring system <br /> or reporting program and the anticipated date for an effectiveness evaluation of the pilot <br /> study. <br /> A letter transmitting the self-monitoring reports shall accompany each report. Such a letter shall <br /> include a discussion of requirement violations found during the reporting period, and actions <br /> taken or planned for correcting noted violations, such as operation or facility modifications. If <br /> the Discharger has previously submitted a report describing corrective actions and/or a time <br /> schedule for implementing the corrective actions, reference to the previous correspondence will <br /> be satisfactory. The transmittal letter shall contain the penalty of perjury statement by the <br /> Discharger, or the Discharger's authorized agent, as described in the Standard Provisions General <br /> Reporting Requirements Section B.3. <br /> The Discharger shall implement the above monitoring program as of the date of the Order. <br /> Z <br /> Ordered by: <br /> �0 <br /> ✓� THOMAS R. PINKOS, Executive Officer <br /> 17 October 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.