Laserfiche WebLink
Page 2 of 3 <br /> Sent: Monday, November 17, 2008 3:49 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Drilling permit for 15. W Harding Way <br /> Mike: I just spoke with our driller, EnProb, and he has availability to drill this Thursday and Friday(11- <br /> 20/21-08). Can we set these dates for the work....? We will likely start about 7AM. I am confirming the <br /> site access issues now for drilling inside the warehouse area. Please confirm. Thanks. <br /> Donald A. Ashton —Senior Geologist, PG, REA, CEM - Nevada <br /> Bureau Veritas North America, Inc. <br /> 6920 Koll Center Parkway, Suite 216 <br /> Pleasanton, CA 94566 <br /> Direct: 925.426.2679 Fax: 925.426.0106 <br /> don.ashton@us.bureauveritas.com <br /> www.us.bureauveritas.com <br /> "Mike Infurna[EH]"<Mlnfurna@sjcehd.com> <br /> To Don Ashton/USANERITAS@VERITAS <br /> 11/17/2008 01:34 PM <br /> cc <br /> Subject RE:Drilling permit for 15.W Harding Way <br /> Ref <br /> you're welcome. <br /> attached is the stamped work plan approval and a copy of the permit. I would <br /> like to be onsite on the first day, typically just after all the safety meetings and <br /> just as you start your probe advancing. I will bring a copy of a permit for the <br /> driller and discuss the grout procedures and times for inspection. <br /> Please provide at least TWO working days notice before you drill/push. <br /> you can call me at my office phone, (209) 468-3454. <br /> rather than leave a message if I don't answer, try my pager, (numerical) (209) <br /> 982-8771 . antique sure, but it works in places my weak county cell phone <br /> doesn't. Enter your phone number and I'll get back to as soon as I can. <br /> My work plan approval states 'neat cement grout from TD to surface for all <br /> borings'. since you didn't Spec this out in the work plan and Dennis Ott did, <br /> thought to bring you into the scope of what is expected. <br /> gw is close to 30'bgs. anymore than 10' of water in the borehole will require <br /> either: <br /> 1- tremie grout in from bottom (TD) to top and collect the displaced gw or, <br /> 2- bentonite chip in the gw column till no more 'splash', then cement grout <br /> 11/19/2008 <br />