My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SEMI-ANNUAL GROUNDWATER MONITORING REPORT AUGUST 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9508
>
2900 - Site Mitigation Program
>
PR0516935
>
ARCHIVED REPORTS_SEMI-ANNUAL GROUNDWATER MONITORING REPORT AUGUST 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 3:50:57 PM
Creation date
2/21/2020 1:32:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SEMI-ANNUAL GROUNDWATER MONITORING REPORT AUGUST 2010
RECORD_ID
PR0516935
PE
2960
FACILITY_ID
FA0012937
FACILITY_NAME
MONIER LIFETILE LLC
STREET_NUMBER
9508
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19321003
CURRENT_STATUS
01
SITE_LOCATION
9508 S HARLAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FCW-1 <br /> Concrete_ — 08/26/10 <br /> Berm TPHd <50 <br /> Cr 10 <br /> —FC-G7❑' r — — DCr 4.8 J <br /> FC-G5O\ FCW-1 _ DCrVI 3.5 <br /> FC-G80 <br /> FCW-2 Explanation <br /> FC-G4 FC-G5 Direct push groundwater sample point <br /> FCW-2 FC-G3 . FC-H1 <br /> b (Brown and Caldwell,June 2001) <br /> 08/26/10 08/26/10' <br /> TPHd <50 <50 1 Q I FC-G6 Approximate location of hand auger and direct <br /> Cr 12 13 FC-G9 Asphalt <br /> push soil boring(URS,December 2002) <br /> DCr 12 12 I Berm <br /> FC-G8 0 Approximate location of soil boring(Geomatrix, <br /> FC-G6 FC-G10 <br /> DCrVI 10 10 I January 2006) <br /> \ <br /> _F_ 0 \ 0 FCW-3* Groundwater monitoring well location <br /> Groundwater flow direction, <br /> Crusher <br /> Reject Tile August 26,2010 <br /> � <br /> J 54 Groundwater sample concentrations in <br /> Fc-G1— micrograms per liter(Ng/L) <br /> FC-G2 <br /> 17-6 <br /> Q FCW-3 a TPHd Diesel-range total petroleum hydrocarbons <br /> Concrete <br /> CO Cr Total chromium <br /> I o <br /> Block Wall <br /> DCr Dissolved chromium <br /> T DCrVI Dissolved chromium VI <br /> Lan <br /> Manufacturing x < Not detected,less than reporting limit shown <br /> Duplicate sample <br /> FCW-3 x pAes <br /> 08/26/10 I J Estimated concentration between the reporting <br /> limit(RL)and the method detection limit(MDL) <br /> TPHd <50 <br /> Cr 49 I —x Fence <br /> DCr 32 C <br /> DCrVI 27 i Approximate area of original stockpile <br /> x <br /> x <br /> 3 <br /> a <br /> o I <br /> 3 <br /> m Amenities <br /> iu Building <br /> L <br /> a I <br /> U x <br /> C X <br /> E Diesel Approximate Scale in Feet <br /> z Gasoline Sample x 0 60 120 <br /> Propane L-7 Shop <br /> c ❑ Maintenanc <br /> (2 1-antis) S rop <br /> 0 3 6 <br /> p <br /> a Approximate Scale in Meters <br /> E Basemap modified from Brown and Caldwell,Site Plan dated <br /> rt January 2002,and URS Corporation,December 2004 <br /> a � <br /> _o TPH-DIESEL, Cr AND Cr VI CONCENTRATIONS IN <br /> GROUNDWATER SAMPLES <br /> August 2010 <br /> N MonierLifetile LLC French Camp Facility <br /> French Camp, California <br /> o- <br /> BFA <br /> ah Date: 11/17/10 Project No.:10626.000.0 <br /> AMEC Geomatrix Figure 5 <br /> FL <br />
The URL can be used to link to this page
Your browser does not support the video tag.