My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
15600
>
2800 - Aboveground Petroleum Storage Program
>
PR0515456
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2020 2:53:28 PM
Creation date
2/21/2020 1:36:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0515456
PE
2832
FACILITY_ID
FA0000174
FACILITY_NAME
JOES TRAVEL PLAZA
STREET_NUMBER
15600
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19620079
CURRENT_STATUS
01
SITE_LOCATION
15600 S HARLAN RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Task Status Comments <br /> 5.5 Strainer b.Access strainer ❑Yes ❑No* ❑N/A <br /> basket and check cap <br /> and gasket seal as <br /> well as bolts. <br /> 5.6 Filter a. Check that the filter ❑Yes ❑No* ❑N/A <br /> is in good condition <br /> and is within the <br /> manufacturer's <br /> expected service life. <br /> Replace, if necessary. <br /> b. Check for leaks and []Yes ❑No* -I N/A <br /> decreased fuel flow <br /> 5.7 Flame Follow manufacturer's ❑ ❑ No I iN/A <br /> arrestors instructions. Check for <br /> corrosion and <br /> blockage of air <br /> passages. <br /> 5.8 Leak detector Test according to ❑ s❑No*❑N/A <br /> for manufacturer's . <br /> submersible instructions and <br /> pump authority having <br /> systems jurisdiction (AHJ). <br /> Verify leak detectors <br /> are suited and <br /> properly installed for <br /> aboveground use. <br /> 5.9 Liquid level a. Has equipment []Yes []No* ❑N/A <br /> equipment been tested to ensure <br /> proper operation? <br /> b. Does equipment ❑Yes ❑No* ❑N/A <br /> operate as required? <br /> c. Follow ❑Yes []No* ❑N/A <br /> manufacturer's <br /> instructions <br /> 5.10 Overfill a. Follow ❑Yes ❑No* ❑N/A <br /> equipment manufacturer's <br /> instructions and <br /> regulatory <br /> requirements for <br /> inspection and <br /> functionality <br /> verification. <br /> b. Confirm device is ❑Yes []No* ❑N/A <br /> suited for above <br /> ground use by the <br /> manufacturer <br /> AST INSPECTION STANDARD 36 SEPTEMBER 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.