Laserfiche WebLink
Geomatrix <br /> SOIL INVESTIGATION WORK PLAN <br /> DECEMBER 2005 <br /> MonierLifetile LLC Lathrop and French <br /> Camp Facilities <br /> Lathrop and French Camp, California <br /> December 6, 2005 <br /> Project No. 10626 <br /> This report was prepared by the staff of Geomatrix <br /> Consultants, Inc., under the supervision of the <br /> Engineer and/or Geologist whose signature appears <br /> hereon. <br /> The findings, recommendations, specifications, or <br /> professional opinions are presented within the limits <br /> described by the client, after being prepared in <br /> accordance with generally accepted professional <br /> engineering and geologic practice. No warranty is <br /> 1--k0NAIEGF� expressed or implied. <br /> �O <br /> No.6943 <br /> Exp, 5 3/ <br /> Linda Conlan, P.G. #6943 <br /> 9TFOF CA��FSenior Geologist <br /> 1�1� <br /> Calvin H. Hardcastle, P.E. #C44751 <br /> Principal Engineer <br />