My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
9508
>
2900 - Site Mitigation Program
>
PR0516935
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 4:23:10 PM
Creation date
2/21/2020 1:37:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516935
PE
2960
FACILITY_ID
FA0012937
FACILITY_NAME
MONIER LIFETILE LLC
STREET_NUMBER
9508
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19321003
CURRENT_STATUS
01
SITE_LOCATION
9508 S HARLAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
►',"� Geomatrix <br /> • data review summary, QA/QC results, and findings; <br /> • copies of laboratory reports and chain-of-custody forms; and <br /> • conclusions. <br /> 8.0 SCHEDULE <br /> The proposed soil investigation will be conducted during two separate field events. The soil <br /> investigation will occur in January 2006 at the French Camp Facility and in June 2006 at the <br /> Lathrop Facility. The timing of the investigations is based on access to soil below the footprint <br /> of each stockpile. Pre-field activities will be initiated following RWQCB approval of this <br /> Work Plan. A summary of the anticipated schedule is as follows: <br /> Expected Duration <br /> Task Description (Weeks from RWQCB Approval) <br /> • Permits 2 weeks <br /> • USA notification and utility locating 3 days <br /> • Soil sampling(1) 2 days at each Facility <br /> • Laboratory Analysis 2 to 3 weeks following sampling <br /> • Reporting 3 to 4 Weeks after obtaining soil data <br /> (1) January 2006 at French Camp and June 2006 at Lathrop. The actual schedule may be affected by factors such <br /> as drilling subcontractor availability,access,and weather. <br /> PAI 0626.000.0\DocsVvILT Soil Work Plan.doc 1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.