My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
2504
>
1900 - Hazardous Materials Program
>
PR0539279
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 2:09:49 PM
Creation date
2/21/2020 2:32:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0539279
PE
1921
FACILITY_ID
FA0022463
FACILITY_NAME
PPG Architectural Finishes Inc. dba PPG Paints
STREET_NUMBER
2504
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
2504 MONTE DIABLO AVE
QC Status
Approved
Scanner
SJGOV\tmorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p.3 <br /> Sample <br /> Employee Training Sigh Ir Sheet <br /> The following topics have been addressed: <br /> 1. Emergency Res ponse/Contingency Plan training, <br /> Z. Spill notification procedures. <br /> 3. Spill reponse procedures. <br /> 4. Evacuation procedures. <br /> Printed name Signature page <br /> Xl4n �3 3 2-a <br /> S� <br /> r <br /> �� <br /> Business plans shall include provisions for ensuringthat appropriate personnel receive Initial and annual <br /> refresher training.All employees shall be trained In safety procedures in the event of a release or <br /> threatened release of a hazardous material, Including, but not limited to,familiarity with the following <br /> plans and procedures: <br /> (A)Immediate notification contacts to the appropriate local emei gency response personnel and to the <br /> unified program agency. <br /> (B) Procedures for the mitigation of a release arthreatened relea a to minimize any potential harm or <br /> damage to persons,property,or the environment. <br /> (C) Evacuation plans and procedures,including immediate notice for the business site. <br /> This training shall be documented electronically or by hard copy a nd shall be made available for a <br /> minimum of three years. <br /> Immediately provide employee training for appropriate personne and submit a copy of the training <br /> records to the EHp. <br />
The URL can be used to link to this page
Your browser does not support the video tag.