Vestar Development Company D47223.01 <br /> March 7, 2006 Page 5 <br /> 6.0 PROJECT SCHEDULE <br /> It is estimated that the proposed work will take approximately six weeks to complete. A summary <br /> of the estimated time to complete individual tasks is outlined as follows: <br /> • Field Work: Drill 21 soil borings to 15 feet bsg- approximately 3 working days. <br /> • Laboratory Testing: Analyze soil samples with a routine turnaround- three weeks. <br /> • Reporting:Preparation ofPreliminary Site Assessment report,review and publishing <br /> -two weeks. <br /> 7.0 LIMITATIONS <br /> In performing such a study, it is understood that a balance must be struck between a reasonable <br /> inquiry into the site conditions and an exhaustive analysis of each conceivable environmental <br /> characteristic. The proposed work is intended to be an interactive process. Additional work may <br /> be required based on the outcome of this investigation. No investigation is thorough enough to <br /> describe all geologic/hydrogeologic conditions of interest at a given site. If conditions are not <br /> identified during the study, such a finding should not be construed as a guarantee of the absence of <br /> such conditions at the site, but rather as the result of the services performed within the scope, <br /> limitations, and cost of the work performed. <br /> Geologic/hydrogeologic conditions may exist at the site that cannot be identified solely by visual <br /> observation. Where subsurface exploratory work is performed,our professional opinions are based <br /> in part on interpretation of data from discrete sampling locations that may not represent actual <br /> conditions at unsampled locations. <br /> This work plan was prepared for the sole use of Vestar Development Company (client) and <br /> appropriate regulatory agencies. Any reliance on this report by a third party is at such party's sole <br /> risk. The professional services will be performed, the findings obtained, and the conclusions <br /> prepared in accordance with generally-accepted engineering principles and practices in San Joaquin <br /> County,California at the time the work is performed. This warranty is in lieu of all other warranties, <br /> either expressed or implied. <br />