My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HETCH HETCHY AQUEDUCT
>
0
>
2900 - Site Mitigation Program
>
PR0527549
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 6:15:49 PM
Creation date
2/21/2020 3:12:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527549
PE
2950
FACILITY_ID
FA0018661
FACILITY_NAME
SF PUC HETCH HETCHY AQUEDUCT
STREET_NUMBER
0
STREET_NAME
HETCH HETCHY AQUEDUCT
City
TRACY
Zip
95304
APN
25517005
CURRENT_STATUS
01
SITE_LOCATION
HETCH HETCHY AQUEDUCT
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10116DP0119 <br /> March 14,2011 <br /> Page 2 of 3 <br /> 3. Ground surface settlement monuments monitoring program .plan (Approved by <br /> SFPUC). <br /> 4. Daily bore logs <br /> 5. Dewatering plan, if needed, to the State representative. <br /> In accordance with General Provision No. 6, SEVEN WORKING DAYS PRIOR to the <br /> start of this work, Permittee shall notify the State Representative ROHULLAH AFZAL, <br /> 908 N. Emerald Avenue, Modesto, CA 95351, (209) 576-6299. All work under this <br /> permit must meet with the approval of the State Representative. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation <br /> of this permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, PERMITTEE SHALL FILL <br /> OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY GRANTOR. <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications <br /> shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, <br /> and Business and Professions Code, Section 8771. Permittee shall physically inspect <br /> the work site and locate survey monuments prior to work commencement. Monuments <br /> shall be referenced or reset in accordance with Business and Professions Code. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation <br /> of this permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, PERMITTEE SHALL FILL <br /> OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY GRANTOR. <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications <br /> shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, <br /> and Business and Professions Code, Section 8771. Permittee shall physically inspect <br /> the work site and locate survey monuments prior to work commencement. Monuments <br /> shall be referenced or reset in accordance with Business and.Professions Code. <br /> A pre-jab conference with the Permittee, Contractor, and State Representative may be <br /> required prior to start of work. Permittee shall contact the State Representative and <br /> arrange the meeting. This meeting may be waived at the discretion of the State <br /> Representative. <br /> Permittee shall, prior to commencement of any work, provide the State Representative <br /> with the name and phone number of the person in responsible charge of the work to <br /> be performed under this permit. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.