Laserfiche WebLink
10116DP0119 <br /> March 14,2011 <br /> Page 2 of 3 <br /> 3. Ground surface settlement monuments monitoring program .plan (Approved by <br /> SFPUC). <br /> 4. Daily bore logs <br /> 5. Dewatering plan, if needed, to the State representative. <br /> In accordance with General Provision No. 6, SEVEN WORKING DAYS PRIOR to the <br /> start of this work, Permittee shall notify the State Representative ROHULLAH AFZAL, <br /> 908 N. Emerald Avenue, Modesto, CA 95351, (209) 576-6299. All work under this <br /> permit must meet with the approval of the State Representative. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation <br /> of this permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, PERMITTEE SHALL FILL <br /> OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY GRANTOR. <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications <br /> shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, <br /> and Business and Professions Code, Section 8771. Permittee shall physically inspect <br /> the work site and locate survey monuments prior to work commencement. Monuments <br /> shall be referenced or reset in accordance with Business and Professions Code. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation <br /> of this permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, PERMITTEE SHALL FILL <br /> OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY GRANTOR. <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications <br /> shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, <br /> and Business and Professions Code, Section 8771. Permittee shall physically inspect <br /> the work site and locate survey monuments prior to work commencement. Monuments <br /> shall be referenced or reset in accordance with Business and.Professions Code. <br /> A pre-jab conference with the Permittee, Contractor, and State Representative may be <br /> required prior to start of work. Permittee shall contact the State Representative and <br /> arrange the meeting. This meeting may be waived at the discretion of the State <br /> Representative. <br /> Permittee shall, prior to commencement of any work, provide the State Representative <br /> with the name and phone number of the person in responsible charge of the work to <br /> be performed under this permit. <br /> 2 <br />