My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HETCH HETCHY AQUEDUCT
>
0
>
2900 - Site Mitigation Program
>
PR0527549
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 6:15:49 PM
Creation date
2/21/2020 3:12:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527549
PE
2950
FACILITY_ID
FA0018661
FACILITY_NAME
SF PUC HETCH HETCHY AQUEDUCT
STREET_NUMBER
0
STREET_NAME
HETCH HETCHY AQUEDUCT
City
TRACY
Zip
95304
APN
25517005
CURRENT_STATUS
01
SITE_LOCATION
HETCH HETCHY AQUEDUCT
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ,,owhey Pacific Drilling, inc.. <br /> GEO-Technical Construction <br /> 1215 Michigan Street <br /> San Francisco,CA 94107 <br /> Tel: 415-401-7022 -Fax:415-' <br /> April 6, 2011 RECEIVED <br /> San Joaquin County APR 11 2011 <br /> Environmental Health Department <br /> 600 East Main St. ENVIRONMENTAL HEALTH <br /> Stockton, CA 95202 PERMIT/SERVICES <br /> Attention: <br /> Project: SFPUC-v.3.0 00410-4 <br /> HH-935B <br /> Section: San Joaquin Pipeline System-Western Segment <br /> Original permit No. 52444 <br /> Procedures for Destruction of(2) Piezometers Pz-9 & P-10 <br /> 1.- Setup drill site with temporary barriers and cones. <br /> 2.- Remove existing kristy box or stovepipe and concrete with jack <br /> hammer. <br /> 3.-Insert AWJ rod(1.75" OD) inside PVC casing to guarantee hollow stem <br /> augers track original borehole. <br /> 4.- Over drill each piezometer with 8"hollow stem augers to total depth. <br /> 5.- Remove all PVC well casing and sand pack. <br /> 6. Tremie cement grout from bottom of borehole 5'- 8' from surface. Chip <br /> rest of hole to 6" from surface. Place soil last 6". <br /> 7.-Remove casing, sand pack and other debris from site each day. <br /> 8.-All locations are in dirt and will be restored to surrounding grade. <br /> Please call if you have any questions or suggestions. <br /> Sincerely, <br /> Terry Cowhey <br /> Chicago •Lajolla <br /> CA Lic# 351525•SFHRC Certification#C081115396•General Engineering A,B,C-57, <br /> 61,D.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.