Laserfiche WebLink
Permit No. CFVR 110216A <br /> Page 3 of 9 <br /> until CONTRACTOR has fulfilled the provisions of this agreement with respect to the removal of tools, equipment and <br /> materials from RAILROAD property.Said policy shall name RAILROAD as additional insured. <br /> 11. The permission herein given shall not be assigned by CONTRACTOR without the prior written consent of RAILROAD, <br /> except in the case of subcontractors who shall be deemed agents of CONTRACTOR, subject to the terms of this <br /> Agreement. RAILROAD Requirements for CONTRACTOR working on RAILROAD Right-of-Way are attached as <br /> CONTRACTOR OCCUPANCY/ACCESS AGREEMENT,Exhibit"B"and made a part hereof. Failure to comply with all <br /> of said requirements shall be grounds for cancellation of this Agreement at the sole option of RAILROAD. <br /> 12. CONSTRUCTION PROVISIONS:In relation to RAILROAD'S track and RAILROAD operations: <br /> a. CONTRACTOR warrants It Nvill place no bore pit closer than 25 feet from the end of the ties of the nearest <br /> track, as measured at right angles from said track; that all of the lines to be installed under RAILROAD'S <br /> track shall be a minimum of five feet six inches below the base of the rail; that carrier pipes)and/or wire lines <br /> sliall be encased in Steel Cashig Pipe in accordance with the attached CONTRACTOR <br /> OCCUPANCY/ACCESS AGREEMENT, Exhibit "D" casing criteria attached hereto; and that casing shall <br /> extend a nwthnum of 25 feet from the center line of the outside track on each side of said crossing,measured at <br /> a right angle to said track. <br /> b. CONTRACTOR shall be solely liable for location and protection of any sub-grade railroad signal wires or <br /> other railroad facilities,which may be impacted by CONTRACTOR WORK. If same shall be damaged by said <br /> WORK,Contractor shall,at its own expense,immediately cause said damage to be corrected. Contractor shall <br /> be solely liable to RAILROAD for any and all costs resulting for any interruption of train service resulting <br /> from CONTRACTOR WORK. <br /> c. Said provisions shall prevail over any lesser provision or standard set out for occupancy of adjoining or <br /> underlying lands. <br /> (This Section Intentionally Left Blank) <br />