My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HETCH HETCHY AQUEDUCT
>
0
>
2900 - Site Mitigation Program
>
PR0527549
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 6:15:49 PM
Creation date
2/21/2020 3:12:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527549
PE
2950
FACILITY_ID
FA0018661
FACILITY_NAME
SF PUC HETCH HETCHY AQUEDUCT
STREET_NUMBER
0
STREET_NAME
HETCH HETCHY AQUEDUCT
City
TRACY
Zip
95304
APN
25517005
CURRENT_STATUS
01
SITE_LOCATION
HETCH HETCHY AQUEDUCT
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit No. CFVR 110216A <br /> Page 3 of 9 <br /> until CONTRACTOR has fulfilled the provisions of this agreement with respect to the removal of tools, equipment and <br /> materials from RAILROAD property.Said policy shall name RAILROAD as additional insured. <br /> 11. The permission herein given shall not be assigned by CONTRACTOR without the prior written consent of RAILROAD, <br /> except in the case of subcontractors who shall be deemed agents of CONTRACTOR, subject to the terms of this <br /> Agreement. RAILROAD Requirements for CONTRACTOR working on RAILROAD Right-of-Way are attached as <br /> CONTRACTOR OCCUPANCY/ACCESS AGREEMENT,Exhibit"B"and made a part hereof. Failure to comply with all <br /> of said requirements shall be grounds for cancellation of this Agreement at the sole option of RAILROAD. <br /> 12. CONSTRUCTION PROVISIONS:In relation to RAILROAD'S track and RAILROAD operations: <br /> a. CONTRACTOR warrants It Nvill place no bore pit closer than 25 feet from the end of the ties of the nearest <br /> track, as measured at right angles from said track; that all of the lines to be installed under RAILROAD'S <br /> track shall be a minimum of five feet six inches below the base of the rail; that carrier pipes)and/or wire lines <br /> sliall be encased in Steel Cashig Pipe in accordance with the attached CONTRACTOR <br /> OCCUPANCY/ACCESS AGREEMENT, Exhibit "D" casing criteria attached hereto; and that casing shall <br /> extend a nwthnum of 25 feet from the center line of the outside track on each side of said crossing,measured at <br /> a right angle to said track. <br /> b. CONTRACTOR shall be solely liable for location and protection of any sub-grade railroad signal wires or <br /> other railroad facilities,which may be impacted by CONTRACTOR WORK. If same shall be damaged by said <br /> WORK,Contractor shall,at its own expense,immediately cause said damage to be corrected. Contractor shall <br /> be solely liable to RAILROAD for any and all costs resulting for any interruption of train service resulting <br /> from CONTRACTOR WORK. <br /> c. Said provisions shall prevail over any lesser provision or standard set out for occupancy of adjoining or <br /> underlying lands. <br /> (This Section Intentionally Left Blank) <br />
The URL can be used to link to this page
Your browser does not support the video tag.