My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HETCH HETCHY AQUEDUCT
>
0
>
2900 - Site Mitigation Program
>
PR0527549
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 6:15:49 PM
Creation date
2/21/2020 3:12:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527549
PE
2950
FACILITY_ID
FA0018661
FACILITY_NAME
SF PUC HETCH HETCHY AQUEDUCT
STREET_NUMBER
0
STREET_NAME
HETCH HETCHY AQUEDUCT
City
TRACY
Zip
95304
APN
25517005
CURRENT_STATUS
01
SITE_LOCATION
HETCH HETCHY AQUEDUCT
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit No. CFVR 110216A <br /> Page 6 of 9 <br /> CONTRACTOR OCCUPANCY/ACCESS AGREEMENT <br /> EXHIBIT`B" <br /> Requirements for Contractors working on RAILROAD Right-of-Way: <br /> A. In order to protect RAILROAD'S investment in its right-of-way and for the safety of persons coming onto RAILROAD <br /> property,RAILROAD has established certain requirements. The following constitute minimum requirements for all persons <br /> coming on or near RAILROAD right-of-way. CONTRACTOR is encouraged to develop their own safety rules that meet or <br /> exceed the following requirements.CONTRACTOR will not be allowed to occupy or work on RAILROAD right of way_prior <br /> to signing and dating this Agreement and returning it to the RAILROAD contact person noted herein <br /> B. All permits and agreements must be in effect,required payments made and insurance certificates received and approved <br /> prior to CONTRACTOR entering RAILROAD right-of-way. Insurance must remain in effect during the entire project. <br /> C. Any dewatering utilizing drains or ditches on RAILROAD property must be approved by RAILROAD. <br /> D. CONTRACTOR must have approved"Construction Plans"prior to commencing work on a project. No changes will be <br /> made to"Construction Plans"without approval by all parties involved. Approved revised plans will be furnished to all parties <br /> prior to implementation of changes. <br /> E.CONTRACTOR will incur all costs for track work,including flagging,etc.,made necessary due to the WORK. <br /> F. Pursuant to Federal Regulation,flagging protection is always required when equipment crosses or is working within 25 feet <br /> of center of any live track. When deemed necessary by RAILROAD,a flagman maybe required at all times while working on <br /> RAILROAD right-of-way. <br /> G. Crossing of any RAILROAD tracks must be done at approved locations and must be over full depth timbers,rubber,etc. <br /> Any equipment with steel wheels,lugs or tracks must not cross steel rails without aid of rubber tires or other approved <br /> protection. <br /> H. If temporary construction crossings are necessary,they must be covered by a Private Roadway and Crossing Agreement, <br /> and must be barricaded when not in use. A Private Roadway and Crossing Agreement is prepared by RAILROAD under the <br /> same general terms as this Agreement. <br /> I. CONTRACTOR must furnish details on how CONTRACTOR will perform work that may affect existing drainage and/or <br /> possible fouling of track ballast as well as removal of overhead bridges/structures. (Structures and bridge spans over tracks <br /> must be removed intact). <br /> J. Absolutely no piling of construction materials or any other material,including dirt,sand,etc.,within 15 feet of center on any <br /> secondary track(25 feet of Main Line and siding tracks)or on property of RAILROAD not covered by an existing Construction <br /> Easement,permit,lease or agreement. A 10'clear area on both sides of a main track must remain unobstructed at all times to <br /> allow for stopped train inspection. <br /> K.(a) All bore pits must be a minimum of 25 feet from the nearest outside rail of any track,measured at a 90 degree angle to <br /> said track and all undertrack bores shall be no less than six feet below the bottom of the ties. <br /> (b) No construction will be allowed within 15 feet of center of any track unless authorized by RAILROAD and as shown <br /> on plans approved by RAILROAD. This includes any excavation,slope encroachment and driving of sheet piles. <br /> L. No vehicles or machines shall remain unattended within 15 feet of a secondary track or within 25 feet of a Main Line track. <br /> M. Should CONTRACTOR in any way interfere with RAILROAD operations or damage property during constnuction <br /> operations over RAILROAD'S tracks and right-of-way,CONTRACTOR,upon demand by RAILROAD to CONTRACTOR <br /> and/or Client,shall immediately stop work on RAILROAD'S right-of-way for a period of not less than 48 hours to allow <br /> RAILROAD to investigate. Any necessary repairs shall be made by RAILROAD at CONTRACTOR'S.sole cost and expense. <br />
The URL can be used to link to this page
Your browser does not support the video tag.