Laserfiche WebLink
CINDER <br /> BLOCK <br /> ADDITION <br /> CORRUGATED <br /> STEEL <br /> COVERED BUILDING <br /> EQUIPMENT <br /> STORAGE <br /> AREA <br /> B-1 <br /> OFFICE <br /> APPROXIMATE PROPOSED ORCHARD <br /> CENTERLINE (y <br /> B-2 <br /> m WOOD FRAME PROPOSED <br /> CORRUGATED STEEL MARCH LANE <br /> HULLING BUILDING EXTENSION . .� <br /> SHED <br /> OB-1 DENOTES NUMBERS AND APPROXIMATE LOCATIONS OF <br /> TEST BORINGS DRILLED FOR THIS INVESTIGATION <br /> APPROXIMATE SCALE IN FEET: 1"=40' BLOSSOM RANCH BUILDING AREA PLATE NO. <br /> o ao so k'q KLEINFELDER MARCH LANE EXTENSION <br /> BETWEEN S.P.R.R. AND HOLMAN ROAD 3 <br /> DATE PRODUCED. 11/24/98 DATE REVISED: STOCKTON, CALIFORNIA <br /> PROJ.NO.20-3712-08.E02 FILENAME:2018D196 <br /> Copyright Kleinfelder, Inc. 1998 <br />