Laserfiche WebLink
Project No.014-14075 <br /> Page No. 3 <br /> 15. Soil cuttings or investigation derived waste(IDW)will be placed in drums and temporary storage <br /> on the site pending the receipt of analytical results. <br /> Reporting <br /> Following completion of the field and laboratory investigation activities, we will prepare a report. The <br /> report will summarize the investigation methodology and will present the results of the chemical analysis <br /> of the soil and/or groundwater samples. If contaminants are encountered, we will identify the <br /> contaminants and will include a comparison of the contaminant levels to State or Federal regulatory <br /> screening levels. In addition to presenting our findings, the report will also include our conclusions and <br /> recommendations, based on the results of the laboratory analyses, that we deem prudent for further <br /> assessment activities if warranted. The laboratory analytical reports for the soil sample analyses will be <br /> appended to the report. Final copies of the report will include two bound copies and an electronic copy <br /> (PDF)sent to the client. <br /> Schedule <br /> Due to the expedited fieldwork requested by the client,drilling is tentatively scheduled for May 1,2014. <br /> CLOSING <br /> If you have any questions or if we may be of further assistance,please do not hesitate to contact our office <br /> at(559)348-2200. <br /> S`pNAL Gtr Respectfully submitted, <br /> 5 <br /> 0�o KRAZAN&ASSOCIATES,INC. <br /> o c� <br /> a MICHAEL .BOWERY N-► �L J4.x)6s% <br /> * Exp.S �/ <br /> N� No.5027 `Q <br /> � Michael Bowery,PG No.5027 <br /> STS Ap C^ OQ` Environmental Division Manager <br /> I <br /> Arthur C.Farkas,IEA 07818 <br /> Environmental Division Manager <br /> KRAZAN&ASSOCIATES,INC. <br /> With Offices Serving the Western United States <br /> 014-14075 San Joaquin Hospital Fronch Camp Workplan FINAL <br />