Laserfiche WebLink
11. Please include a copy of any studies (soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: e� ) <br /> b. Sewage Disposal: <br /> C. Storm Drainage: _ zt <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension(s ) : <br /> d. Natural Gas : �• �. <br /> e . Electricity: <br /> f . Road/Access ( i .e . , paved unpaved, public/private, road name ) : <br /> r _ e w a oct <br /> g . Fire:MoKe ur ktC. Distance, to nearest fire station: n�.' �_ s <br /> h . Schools : <br /> 2 . Describe any site alterations which result from the proposed.pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures' be of tree removed, etc. ) . <br /> v/?-1 .S O OlNe 5 i��- - <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> ND �fl� <br /> Types of emissions and sources associated with project <br /> NOSE <br /> Fuel sources (and amounts ) to be consumed by or as a . result of the <br /> completed project I/A <br /> Will the project result in substantial air emissions or 'deteriora- <br /> tion of ambient air quality? XNO YES ac <br /> 4 . How much agricultural land will be removed from .?.!': <br /> g production? <br /> Irrigated yz.,-- creS Not irrigated `<<. <br /> Minor Subdivision - 9 - (6/86 ) <br />