Laserfiche WebLink
Work Plan—Soil Boring installation Page 4 <br /> Boudanes Property <br /> Project 422.2 <br /> February 19, 2004 <br /> 3.0 REPORTING <br /> The information gathered during this phase of work will be presented in a <br /> report, which will include a description of the field work, results of sample <br /> analyses, and their implications. The report will be prepared and signed by a <br /> registered geologist responsible for the work. <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209)569-0293 <br /> Modesto, Ca 95356 Fax: (209)569-0295 <br />