Laserfiche WebLink
CONTENTS <br /> 1.0 INTRODUCTION ...................................................................................................................... 3 <br /> 2.0 SITE DESCRIPTION................................................................................................................. 4 <br /> 3.0 SCOPE OF WORK..................................................................................................................... 4 <br /> 3.1 Utility Service Notification..................................................................................................... 4 <br /> 3.2 Soil &Groundwater Sampling................................................................................................ 4 <br /> 4.0 LABORATORY ANALySIS...................................................................................................... 5 <br /> S.0 REPORTING.............................................................................................................................. 6 <br /> 6.0 RESIDUALS MANAGEMENT.................................................................................................. 6 <br /> 6.1 Drill cuttings.......................................................................................................................... 6 <br /> 6.2 Purge water............................................................................................................................ 6 <br /> 7.0 SITE HEALTH AND SAFETY PLAN....................................................................................... 6 <br /> FIGURES <br /> Figure 1 Site Location /Topographic Map <br /> Figure 2 Site Vicinity Map <br /> Figure 3 Utility Location Map <br /> Figure 4 Potential Boring Location Map <br /> Remediation Pilot Study Workplan Pinnacle Environmental,Inc. <br /> 248 Industrial Drive,Stockton,CA Page 2 <br />