Laserfiche WebLink
6.2 Purge water <br /> Groundwater extracted from development and purging of the piezometers will be <br /> contained and securely stored on site until laboratory analysis results are received. These results <br /> will be used to determine the proper disposal of this groundwater—i.e., manifested as hazardous <br /> waste to an appropriate treatment facility or, if non-hazardous,to the site's septic system. <br /> 7.0 SITE HEALTH AND SAFETY PLAN <br /> A Health and Safety Plan (HASP) has been developed for this limited subsurface site assessment <br /> and will be appropriately implemented prior to the beginning of field work. <br /> Remediation Pilot Study Workplan Pinnacle Environmental,Inc. <br /> 248 Industrial Drive,Stockton,CA Page 7 <br />