My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
500
>
2900 - Site Mitigation Program
>
PR0544075
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 10:05:03 AM
Creation date
2/25/2020 8:43:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544075
PE
2965
FACILITY_ID
FA0013593
FACILITY_NAME
MORADA PRODUCE
STREET_NUMBER
500
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10504015
CURRENT_STATUS
04
SITE_LOCATION
500 N JACK TONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INFORMATION SHEET <br /> ORDER NO. R5-2003-0178 <br /> MORADA PRODUCE COMPANY <br /> LINDEN PACKING SHED <br /> SAN JOAQUIN COUNTY <br /> Morada Produce Company(MPC)packages freshly harvested onions and is expanding its <br /> operations to include packaging of fresh asparagus and cherries. Onions are packaged dry but <br /> wastewater will be generated while processing asparagus and cherries. Wastewater will be <br /> generated seven days a week from February to April (asparagus season) and May to June (cherry <br /> season). The facility is located east of Stockton at 500 N. Jacktone Road. <br /> The expansion of the existing facility will be constructed in two phases. Phase I will be a 27,800 <br /> sq. ft. addition to the existing onion packing operation. This addition will consist of a 20,000 sq. <br /> ft. asparagus packing operation and a 7,800 sq. ft. cold storage room. Phase II will'be the <br /> expansion of the 20,000 sq. ft. building for a cherry processing line, a new office, and an <br /> attached restroom facility. <br /> Industrial wastewater will consist of rinse water and hydrocooler water. Rinse water is <br /> discharged daily during the processing season; hydrocooler water is discharged twice a week as <br /> needed. Wastewater is stored in an unlined storage pond into which stormwater will also be <br /> discharged. Wastewater in the pond will be used for irrigation of approximately 160 acres of <br /> walnut orchards located adjacent to the packing facility <br /> MPC's treatment of process wastewater consists of screening prior to discharge into a 1.46 <br /> million gallon wastewater pond. Wastewater in the pond will be further treated through <br /> biological activity, settling, and volatilization of organic compounds. Wastewater generated by <br /> washing asparagus and cherries contains approximately 50 mg/L of chlorine. Trihalomethanes <br /> (THMs) are formed when chlorinated water is brought into contact with organic matter. At <br /> MPC, organic matter may be naturally present in the well water supply, may be introduced into <br /> the process water during the chilling operation, or may be present in the wastewater pond. <br /> The forecast wastewater generation rate is approximately 140,000 gallons per month. Because <br /> industrial wastewater is mixed with stormwater in the pond, all the water collected will be <br /> handled and disposed of as industrial wastewater. <br /> Wastewater is discharged to a 160-acre walnut orchard. Based on the RWD's water balance, the <br /> pond will go dry in September, even using the 100-year return annual rainfall amount. The pond <br /> will likely go dry earlier in the year during normal rainfall amount years. Because the <br /> wastewater does not provide enough water for irrigation of the orchard, supplemental irrigation <br /> water is mixed with the wastewater and applied to the crops. Mix ratios (the amount of <br /> supplemental water divided by the amount of process/stormwater)will vary from a minimum <br /> factor of 5 in December, to a maximum of 217 in July. <br />
The URL can be used to link to this page
Your browser does not support the video tag.