My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
500
>
2900 - Site Mitigation Program
>
PR0544075
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 10:05:03 AM
Creation date
2/25/2020 8:43:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544075
PE
2965
FACILITY_ID
FA0013593
FACILITY_NAME
MORADA PRODUCE
STREET_NUMBER
500
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10504015
CURRENT_STATUS
04
SITE_LOCATION
500 N JACK TONE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. -6- <br /> MORADA PRODUCE COMPANY <br /> LINDEN PACKING SHED <br /> SAN JOAQUIN COUNTY <br /> 5. A discussion of any data gaps and potential deficiencies/redundancies in the monitoring system <br /> or reporting program; <br /> 6. Summary of information on the disposal of septage and vegetable derived solid waste; <br /> 7. The results from annual monitoring of the groundwater wells; and <br /> 8. A forecast of influent flows, as described in Standard Provision No. E4. <br /> A letter transmitting the self-monitoring reports shall accompany each report. Such a letter shall include <br /> a discussion of requirement violations found during the reporting period, and actions taken or planned <br /> for correcting noted violations, such as operation or facility modifications. If the Discharger has <br /> previously submitted a report describing corrective actions and/or a time schedule for implementing the <br /> corrective actions, reference to the previous correspondence will be satisfactory. The transmittal letter <br /> shall contain the penalty of perjury statement by the Discharger, or the Discharger's authorized agent, as <br /> described in the Standard Provisions General Reporting Requirements Section B.3. <br /> The Discharger shall implement the above monitoring program as of the date of this Order. <br /> Ordered by: <br /> THOMAS R. PINKOS, Executive Officer <br /> (Date) <br /> TRO: 9/29/2003 <br /> VAS=_JoaquinNon I5\Su11`.ObrimTSan JoaquinToppiano Morada ProduceWRPr I.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.