Laserfiche WebLink
Mine Name: 6ALLO e > S Checklist Completed b Vag SAI�J) !I,' <br /> End Use: x,I cv .r L Date: 3-0L7/. 2i i)I <br /> GENERAL CONSIDERATIONS <br /> Authority Requirements/Practices/Standards `r <br /> N/A <br /> Required contents chart: <br /> PRC 2772(b) A chart identifying the location (e.g. page number, chapter, appendix, or other location in the <br /> reclamation plan) of content that meets the requirements of PRC Sections 2772, 2773, 2773.3 <br /> and CCR Articles 1 and 9 as delineated in this checklist). <br /> PRC Contact information: <br /> 2772(c)(1) Name and address of the surface mining operator and any person designated by the operator as P 9 <br /> an agent for service of process must reside in CA). <br /> PRC Material quantity and type: <br /> 2772(c)(2) The anticipated total quantity and type of minerals to be mined (see Annual Report Instructions, �? <br /> Exhibit B,for mineral types and units of measure). <br /> PRC Dates: <br /> 2772(c)(3) The initiation and termination dates of mining (be as specific as possible, e.g. December 31, p3 <br /> 2030). <br /> PRC Depth of mining: A <br /> 2772(c)(4) The maximum anticipated depth of the surface mining operation. <br /> Reclamation plan maps shall include: <br /> Size and legal description of lands affected by surface mining operations; ✓'i <br /> Names and addresses of owners of all surface interests and mineral interests; �L <br /> PRC Property lines, setbacks, and the reclamation plan boundary; <br /> (c)(5) Existing and final topography with contour lines at appropriate intervals; <br /> 2772 » <br /> 2772Detailed geologic description of the area of the surface mining operation; � <br /> Locations of railroads, utility features, and roads(access roads, temporary roads to be <br /> reclaimed, and any roads remaining for the end use). <br /> All maps, diagrams, or calculations that are required to be prepared by a California-licensed <br /> professional shall include the re arer's name, license number, signature &seal. <br /> PRC Mining method and schedule: <br /> 2772(c)(6) A description of the mining methods and a time schedule that provides for completion of mining P3 <br /> on each segment so that reclamation can be concurrent or phased. <br /> Subsequent use(s): <br /> 27R72( c)(7) A description of the proposed subsequent use(s)after reclamation PC <br /> Evidence that all landowners have been notified of the proposed use. 194 <br /> PRC Impact on future mining: r$ <br /> 2772(c)(9) A statement regarding the impact of reclamation on future mining on the site. <br /> PRC Signed statement: <br /> 2772(c)(10) Statement signed by the operator accepting responsibility for reclamation of the mined lands per f'9 <br /> the reclamation plan. <br /> Pre-SMARA areas: <br /> PRC 2776(b- Reclamation plans shall apply to operations conducted after January 1, 1976 or to be conducted �� <br /> C) in the future. Mined lands disturbed prior to January 1, 1976 and not disturbed after that date <br /> may be excluded from the reclamation plan. <br /> CCR Public health and safety: <br /> 3502(b)(2) A description of how any potential public health and safety concerns that may arise due to <br /> exposure of the public to the site will be addressed. <br /> Equipment storage and waste disposal: <br /> CCR 3709(a) Designate areas for equipment storage and show on maps. <br /> All waste shall be disposed of in accordance with state and local health and safety ordinances. <br /> CCR 3709(b) Structures and equipment removed: <br /> Reclamation Plan Content Checklist—Page 2 of 6 Revised April 9,2018 <br />