My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2200 - Hazardous Waste Program
>
PR0523619
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:04:26 PM
Creation date
2/27/2020 1:44:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523619
PE
2220
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROOFTEST <br /> DATA: TESTED 4/11/13 <br /> TIME PRESSURE, psi TEMP., OF TEMP., °K <br /> 21:19 5.00 74.0 296.3 <br /> 21:37 5.00 72.0 295.2 <br /> 21:56 4.90 71.0 294.7 <br /> 22:05 4.95 70.0 294.1 <br /> 22:20 4.98 70.5 294.4 <br /> OBSERVATION: 1). NO OUTSIDE LEAKS OR RUPTURES IN TANK OR COLLECTION PIPING. <br /> 2). CONTAINMENT CAVITY REMAINED DRY . <br /> CONFIRMATION: GAY-LUSSAC'S LAW, P2=P,(T2/T,) FOR FIXED VOLUME AND MASS <br /> P2=5.00(294.1/296.3)=4.96psi O.K. <br /> CONCLUSIONS: 1). PRESSURE VARIANCE WAS CAUSED BY THE TEMPERATURE CHANGES. <br /> 2).THE TANK IS PROVED TO WITHSTAND THE INTENDED PRESSURES <br /> WITH A FACTOR OF SAFETY OF 2. <br /> 3).THE CURRENT CONDITIONS OF THE WASTE OIL TANK IS IN <br /> COMPLIANCE WITH C.C.R. 66265.192(k) <br /> EVALUATIONS <br /> WASTE OIL TANK: The waste oil tank itself is intact and compatible with waste oil. The waste oil <br /> tank was proofed to twice the intended static hydraulic pressures and is in compliance with C.C.R. <br /> 66265.192(k). <br /> LEAK DETECTION EQUIPMENT: The leak detection equipment consists of a visual observation <br /> bung and a dipstick rod. The dipstick and bung cap are present and is in compliance with C.C.R. <br /> 66265.192(k). <br /> CORROSION PROTECTION EQUIPMENT: The corrosion protection is furnished by an intact <br /> exterior coat of paint,closed secondary containment cavity and is indoors not exposed to the weather. <br /> The corrosion protection system is in compliance with C.C.R. 66265.192(k). <br /> SPILL PREVENTION: Spill prevention is furnished by a diaphragm collection pump with cam lock <br /> connections to the waste oil trolley pans attached to the vehicle lifts. The collection system eliminates <br /> the potential of spilling an oil pan while it sits on the floor or while carrying it to the waste oil tank. The <br /> collection piping is in plain sight making it observable for leaks. The collection piping was pressurized <br /> with the tank proof test and was proofed to twice the intended static hydraulic pressures and is in <br /> compliance with C.C.R. 66265.192(k). <br /> OVERFLOW PROTECTION: An accurate depth indicator is utilized to ensure there is sufficient <br /> volume remaining in the waste oil tank prior to emptying the waste oil trolley pans. The trolley pans are <br /> of sufficient size to hold waste oil from multiple vehicles. The collection system requires the hoses and <br /> air valves to be manually operated,eliminating the risk of unattended automatic equipment overfill. <br /> The waste oil is collected every two weeks on a contracted schedule,ensuring there is always sufficient <br /> capacity in the waste oil tank. The methodology used is in compliance with C.C.R. 66265.192(k). <br /> CERTIFICATION <br /> I certify under penalty of law that this document and all attachments were prepared under my direction <br /> or supervision in accordance with a system designed to assure that qualified personnel properly gather <br /> and evaluate the information submitted. Based on my inquiry of the person or persons who manage the <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.