Laserfiche WebLink
Return to Complialice! <br /> Attention: S acy Rivera <br /> West Valley Auto pa, Inc. 2615 W.Grant line Road,Tracy,CA 95304 209.836.3464 <br /> May 2,2013 <br /> #1 HSC 2 29P.2 Current financial responsibility documents not on file with the environmental <br /> health departmen:(EHD). <br /> CORRECTIONS M E: Completed the financial responsibility documents at the time of inspection. <br /> # OR CCR Z637 Secondary containment:(a)test not performed; (e)test report not submitted <br /> within 30 days; (f)test notification not provided to the EHD at least 4H hours prior to test. <br /> CORRECTIONS MA DE: Secondary containment testing completed on April 23, 2013. EHD received 5 <br /> days prior notice if testing to be completed for product piping,vent piping,and vapor recovery piping. <br /> Secondary cont-air ment testing completed in full and passing. EHD now has all testing and repair results <br /> from: Tankology, ettler-Ryan,and Reliable Petroleum. <br /> This site will en$L re and follow up with all contractors to provide EHD will all testing results within 30 <br /> daytime frame as required, <br /> All permitted rep irs will be conducted with the 6 month time frame as prescribed by EHD and not <br /> Gettler-Ryan.This site understands that the repair time frame begins on the date of initial repair, <br /> regardless of any 3dditional days needed thereafter. <br /> #117 CCR 2661 Permit to repair UST system not obtained. <br /> CORRECTIONS M DE: This site has spoken with UST--DO regarding the need for a 24 hour permit for <br /> cold start when a arm history is blank. Enclosed are March 2012 DO report,and 2 work orders. <br /> DO WILL MONITC R SYSTEM FOR DEFECTS regarding blank leak detection. <br /> 4201 CCR 271 (b) Maintenance&monitoring records not maintained 3 years,cathodic protection <br /> records for 6 Y y �IIars,written performance claims pertaining to release detection systems for 5 years, or <br /> records of repair,linings,and upgrades for the life of the tank. Monitoring records include: (1)date <br /> and time of monitoring or sampling; (2) monitoring equipment calibration and maintenance records; (3) <br /> results of any visual al observations;(4)results of sample analysis performed a lab or in the field;(5)logs <br /> of all readings of gauges or other monitoring equipment,ground water elevations,or other test results; <br /> (6)results of inventory readings and reconciliations. <br /> CORRECTIONS M DE: Contractor work orders are all accounted for with no additional records.This <br /> site has advised T0 CONTRACTOR that all work orders must be submitted. Currently all work orders <br /> match ail billingithout any discrepancies. Last Marchand during disputed alarm histories Thuy Tran of <br /> EHD was seen p1hing numerous veeder root buttons and appeared very confused. <br />