Laserfiche WebLink
a <br /> -ERMIT COMPLETED <br /> OST IN CONSPICUOUS PLACE <br /> ,T r , r Y INSPECTION RECORD <br /> -_owCity of Tracy <br /> /l/ Development 8Engineering-Services Department <br /> 333 Civic Center PlazaOffice: (209)831-6400 'Fax: (209) 831-6439 <br /> Application Date /6/2011 Major Cross Street: <br /> 12 <br /> Permit Number 1 /6/20 <br /> Issuance Date APN 21229017 <br /> -1351 <br /> Project Address 2615 GRANT LINE RD <br /> Project Description SEISINIIC ANCHORING OF OIL TANK <br /> Project Owner MUTNICK,STEVEN Telephone 4088363698 <br /> Mailing Address 511 DE CARLI CT <br /> ,AI ' Contractor Name Telephone <br /> Mailing Address <br /> Valuation $ 3,300.00 Type <br /> T.I. <br /> Obtain Building Inspectors signature prior_to covering each phase of work noted below <br /> Code Inspection Type Inspector Date Code Inspection Type Inspector Date Notes <br /> 010 Underground Plumb 092 1 Electric Service <br /> 011 Underground Elect 093 Gas Service <br /> 012 Underground Mach RE-ROOF <br /> 013 Storm Drain 100 Tear Off <br /> 021 Setbacks 101 Structural/Frame <br /> 022 Footings/Piers 102 Roof Nail <br /> 023 Ufer Ground 103 Final Roof <br /> 024 Slab SWIMMING POOLS <br /> 030 ALL UNDER FLOOR 111 Pre-Gunite <br /> =` 031 Under floor Plumbing 112 Underground Elect <br /> 032 Under floor Mechanical 113 Gas Test <br /> 033 Under floor Electrical 114 Circulating Lines/Test <br /> 034 Under floor Framing 115 Pre Deck <br /> 035 Under floor Insulation 116 Pre-Plaster/Final <br /> 051 Roof Diaphragm MISCELLANEOUS <br /> 052 Interior Shear 121 Suspended Ceiling <br /> 053 Floor Diaphragm 122 Tilt-Up Panels <br /> 054 Exterior Shear 123 Masonry/Block Wall <br /> 064 ALL ROUGH 124 Shower Pan <br /> 065 Rough Building/Frame 125 FINAL WATER HEATER <br /> 066 Rough Plumbing 126 FINAL HVAC <br /> 067 Rough Mechanical 130 ALL FINALS <br /> 068 Rough Electrical 13 Flood Certification <br /> 069 PV Roof Supports IFinal Building . <br /> 071 Insulation ma m ^_ <br /> 081 ILath 134 Final Electrical <br /> 082 JDrywall Nail 135 Final Mechanical <br /> 083 1 Gas Test 140 Final Accessibility <br /> FOR NON-RESIDENTIAL PROJECTS THE FOLLOWING APPROVALS ARE NEEDED PRIOR TO FINAL BUILDING INSPECTION APPROVAL <br /> Planning Final I I For Inspections call 831-6400 and ask for the Project Planner. <br /> Engineering Final For Inspection call Construction Inspection at 831-6460. <br /> fire Dept.Final For Inspection call Fire Prevention at 831-6444. <br /> Additional comments on reverse side <br /> INSPECTION REQUESTS MUST BE CALLED IN NO LATER THAN 5:30 AM THE DAY THE INSPECTION IS <br /> DESIRED. PLEASE REMEMBER WE ARE CLOSED EVERY OTHER F <br /> INSPECTION REQUESTS (21!2 31-6440 <br />