Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2 <br /> TYPE OF ACTION ❑1.NEW PLAN ❑ 2.CHANGE OF INFORMATION j `1 ) 490-1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(,,;) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I <br /> BUSINESS NAME(Same as FACILITY NAME) .� b /,1 �.V CAS G 3 <br /> BUSINESS SITE ADDRESS (j' 41 f , `r R/)' 103 CITY µ u <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638 2641 <br /> EQUIPMENT IS SERVICED I.ANNUALLY ❑ 99.OTHER490-3' <br /> MONITORING E <br /> Q (Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN.k2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490.5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> _ PANEL MANUFACTURER: - - 411. MODEL#: 490.8 <br /> LEAK SENSOR MANUFACTURER: 4901. MODEL#(S): 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: _ _ 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14_ MODEL#(S): 490-15 <br /> -------------------------------------- - ----- ----- - ---- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ____ _ __ ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER49018 <br /> g•P• g�P• (Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.2° <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS [Ib.60 HOURS 4990--22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: [I a.ANNUALLY [Ib.BIENNIALLY [j c.OTHER(Specify): 4990-zs <br /> ❑99.OTHER (Specify): 90 <br /> 4 0 -27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> [;UAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:%#.DRY ❑b.LIQUID FILLED [3c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> ----------- <br /> PANEL MANUFACTURER: -� 490-30 MODEL#: - 'S 490-31 <br /> LEAK SENSOR MANUFACTURER: N0e,�ra90-3z MODEL#(S): - 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e,TURBINE)SHUTDOWN. �a.YES ❑b.NO 490-34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Xa.YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> - PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 263 - -__-- 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2630 490-39 <br /> -- ------------------ - -- <br /> ELLD MANUFACTURER(S) e" r00+ -- 490-40.MODEL#(S): -_- - 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490.42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS 1 4904649047 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 49049 <br /> •Allowed for monitoring of unburied emerigency gmemtor fuel piping only per HSC 2528I.5 6 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(x)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 52 <br /> 1:199.OTHER(Specify) 490 53 <br /> UPCF UST-D(12/2007)1/4 <br />