My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
op i) A completed certification of financial responsibility must be submitted prior to the <br /> final inspection. A copy is enclosed. <br /> (ii) A completed form C must be submitted prior to the final inspection. A copy is <br /> enclosed. <br /> 11_22--D�f (iv) Submit an As-Built plan to EHD at the time of the final inspection. Note: A final <br /> inspection will not be performed unless the as-built is submitted. <br /> (v) Monitoring Certification. <br /> (g) Enhanced Leak Detection(SR0038166): notify this office 48 hours prior to install and to <br /> perform the tests which include,but are not limited to,pre test,re-test, and actual test. <br /> (i) Before the underground storage tank is placed in use, the underground storage tank <br /> shall be tested after installation to demonstrate that the tank is product tight. <br /> (ii) A copy of the enhanced leak detection test report shall be submitted a to this office <br /> within 60 days of completion of the test. <br /> 9. Secondary containment systems installed on or after January 1, 2001 shall be tested upon <br /> installation, 6 months after installation, and every 36 months thereafter; result shall be <br /> received by this office within 30 days of the completion of the test. <br /> 10. This permit expires on the June 30, 2004 if the tanks and associated piping are not <br /> placed in the ground. Please note that this review is based on HSC 25290.2. for <br /> underground storage tanks installed on or after July 1, 2003 and before July 1, 2004. If <br /> underground storage tanks are installed on or after July 1, 2004, a new design for new <br /> requirements in accordance with HSC 25290.1. shall be submitted for approval prior to <br /> placement of the tank and associated piping in the ground. <br /> If you have any further questions, please contact me at (209)468-9850. <br /> Thanks, <br /> cy'a4ex') r— 'g�, _ <br /> Steven C. Shih, Senior R.E.H.S. <br /> San Joaquin County <br /> Environmental Health Department <br /> Cc: - Sam Hirbod– 111 Deerwood Road#110, San Ramon, CA 94583 <br /> - CGRS, Inc–P.O. Box 1489, Fort Collins, CO 80522 <br /> Enclosed: - Monitoring plan. <br /> - Response plan. <br /> - Certification of financial responsibility and letter from Chief Financial Officer. <br /> -Form C. <br /> 2615 W.Grant Line Road,Tracy Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.