Laserfiche WebLink
TABLE OF • <br /> Section 1. Introduction.........................................................p.2 Section 11. Piping and Venting...........................................p.18 <br /> 1.1. Safety 11.1. Internal Piping <br /> 1.2. General 11.2. External Piping <br /> 1.3. Definitions 11.3. Venting Tank <br /> 11.4. Venting Interstitial Space <br /> Section 2. Preparation for Installation...............................p.3 <br /> 2.1. General Section 12. Filling Tank........................................................p.19 <br /> 12.1. General <br /> Section 3. Preinstallation Testing.......................................p.4 <br /> 3.1. General Section 13. Backfilling to Grade.........................................p.19 <br /> 3.2. Single-Wall Tank 13.1. General <br /> 3.3. Double-Wall Tank with Dry Interstitial Space <br /> 3.4. Double-Wall Tank with Wet Interstitial Space Section 14. Deflection Measurement.................................p.19 <br /> 3.5. Single-Wall Multicompartment Tank with 14.1. General <br /> Single-Wall Bulkhead 14.2. Diameter Measurement without a Standpipe <br /> 3.6. Single-Wall Multicompartment Tank with 14.3. Diameter Measurement with a Standpipe <br /> Double-Wall Bulkhead(s) 14.4. Calculation and Comparison <br /> 3.7. Double-Wall Multicompartment Tank with Dry <br /> Interstitial Space Section 15. Monitoring ..........p.20 <br /> 3.8. Double-Wall Multicompartment Tank with Wet 15.1. Single-Wall Tank <br /> Interstitial Space 15.2. Double-Wall Tank <br /> 15.3. Tank with Dry Interstitial Space <br /> Section 4. Backfill Material................................................p.10 15.4. Tank with Wet Interstitial Space <br /> 4.1. General <br /> Section 16. Installing Containment Sumps.......................p.21 <br /> Section 5. Excavation Parameters....................................p.10 16.1. General <br /> 5.1. General 16.2. Preparing Containment Sump Body and <br /> 5.2. Burial Depth Collar <br /> 5.3. Tank Spacing 16.3. Sealing and Assembly <br /> 5.4. Tank Location—Nearby Structures 16.4. Hydrostatic Water Test <br /> 5.5. Geotextile 16.5. Watertight Cover Installation <br /> 16.6. Final Containment Sump Installation <br /> Section 6. Anchoring Tanks...............................................p.13 <br /> 6.1. Deadmen Section 17. Adding Tanks at Existing Locations..............p.25 <br /> 6.2. Xeres Prefabricated Deadmen 17.1. General <br /> 6.3. Anchor Slab 17.2. Preferred Method <br /> 6.4. Hold-down Straps 17.3. Alternate Method <br /> 6.5. Hardware and Anchoring Points <br /> 6.6. Man-Out-of-Hole Anchoring Section 18. Operating Guidelines.......................................p.26 <br /> 6.7. Alternate Anchoring Methods in Wet-Hole 18.1. General <br /> Installations 18.2. Filling Tank <br /> 18.3. Entering Tank <br /> Section 7. Bottom Sumps and Fittings............................p.16 <br /> 7.1. General Section 19. Limited Warranties...........................................p.26 <br /> 19.1. General <br /> Section B. Installation.........................................................p.16 <br /> 8.1. General Section 20. Selected List of Supplemental Materials......p.26 <br /> 8.2. Dry-Hole Installation 20.1. General <br /> 8.3. Wet-Hole Installation <br /> Section 21. Retaining Installation Manual.........................p.26 <br /> Section 9. Postinstallation Testing...................................p.17 21.1. General <br /> 9.1. General <br /> Addenda. Tank Installation Checklist..............................p.27 <br /> Section 10. Ballasting..........................................................p.17 Tank Handling Data..........................................p.28 <br /> 10.1. General <br />