Laserfiche WebLink
3/8"Wire Rope <br /> f —Live End N—Dead End <br /> {—Load <br /> t . <br /> Load <br /> .4—Dead End—*4—--Live End -►I <br /> / <br /> / t 1/2"Wire Rope <br /> Live Eno Dead End <br /> :4 <br /> Tad ► <br /> i` <br /> -4Dead End Live End ► <br /> FIGURE 6-5 <br /> FIGURE 6.3 <br /> 6.6.MAN-OUT-OF-HOLE ANCHORING <br /> 6.5.8.All exposed metal on the anchoring system must be 6.6.1.The Xerxes man-out-of-hole(MOH)strapping system is <br /> coated or galvanized to protect against corrosion. designed for use in installations where water is in the excavation <br /> and/or where personnel may not enter the hole because of site <br /> 6.5.9.When fastening wire rope,use a minimum of two clips for restraints.An MOH strapping system can be,but need not be, <br /> a 318-inch wire rope and three clips fora 1/2-inch wire rope on used in conjunction with Xerxes deadmen. <br /> each termination.See TABLE 6-3 for minimum wire-rope diameter. <br /> 6.6.2.When using the MOH strapping system,the placement of <br /> 6.5.10.Turn back from thimble the exact amount of wire rope components is critical.(See FIGURE 6-6.)See separate Xerxes <br /> specified by the manufacturer of the clips used. document,Man-Out-of-Hole(MOH)Straps Instructions. <br /> ill—if <br /> 6.5.11.Apply the first clip at a distance from the dead end of the _ Load Binder <br /> (I j <br /> wire rope that is equal to the largest width of the clip used.(See I ( 10111 <br /> FIGURE 6-4.) <br /> 11111 E <br /> 6.5.12.For each clip,apply a U-bolt over the dead end of wire strap Strap — <br /> rope.(See FIGURE 6-4.)(Note: Live end rests in saddle.) =1= Tank r— �f <br /> affi { = <br /> Xerxes 18 <br /> Fi� �II� <br /> 1`Clip 3f°Clip 2'Clip -- 7-7ii Deadman i {{ <br /> Live End Thimble ( =l t! k <br /> — <br /> FIGURE 6-6 <br /> Loop 6.7.ALTERNATE ANCHORING METHODS IN WET-HOLE <br /> Dead End INSTALLATIONS <br /> FIGURE 6-4 6.7.1.In wet-hole installations,when Xerxes'preferred method <br /> of man-out-of-hole anchoring is not available,the following <br /> 6.5.13.When two clips are required,apply the second clip as methods may be used. <br /> near the loop or thimble as possible.(See FIGURE 6-4.) <br /> 6.7.1.1.With both methods,place the hold-down strap between <br /> 6.5.14.When more than two clips are required,apply the second the wire rope and the tank so that the wire rope is never in direct <br /> clip as near the loop or thimble as possible,turn nuts on second contact with the tank. <br /> clip firmly,but do not tighten initially.(See FIGURE 6-4.) <br /> 6.7.1.2.The H-shaped positioning clips around the strap are <br /> 6.5.15.When more than two clips are required,space additional designed to accommodate the wire rope on top of the strap <br /> clips equally between the first two,take up rope slack,and as shown in FIGURE 6-7 and FIGURE 6-8. <br /> tighten nuts on each U-bolt evenly. <br /> 6.7.1.3.The following method is shown in FIGURE 6-7: <br /> 6.5.16.Tighten all hardware uniformly and follow the manufac- attach a wire rope to each end of each hold-down strap; <br /> turer's torque specifications.Double-check the tightness once secure the termination of the wire rope(See SECTION 6.5. <br /> the anchoring system is complete. for suggested method.); <br /> 6.5.17.If forming a loop in the wire rope,a splice is required for center each hold-down strap on each rib marked with the <br /> connecting the two ends together.Standard rigging practice for arrowhead symbols 0-41 ; <br /> splicing wire rope calls for using twice the number of clips place the deadmen on top of the wire ropes on each side of <br /> recommended for a single-end termination.Use a minimum of the tank; <br /> four clips for a 3/8-inch wire rope and a minimum of six clips for lower the deadmen to the bottom of the excavation; <br /> a 1/2-inch wire rope.Place the rope ends parallel to each other take the slack out of each wire rope and splice the termination <br /> and install the clips as shown in FIGURE 6-5. of the wire ropes on top of the tank(See SECTION 6.5.). <br /> 15 <br />