Laserfiche WebLink
WARNING 14. DEFLECTION <br /> Overfill protection,such as automatic shut-off devices or 14.1.GENERAL <br /> vent-restriction devices,should not be installed if 14.1.1.Obtain the deflection measurement by taking a minimun <br /> owner/operator will allow pump or pressure filling of the of two measurements of the internal diameter of the tank. <br /> tank. Failure to follow this instruction could cause tank <br /> failure and result in death or serious injury. 14.1.2.Two methods of measuring the internal diameter of the <br /> tank are described here.Both methods use a dipstick.(Similar <br /> 11.4.VENTING INTERSTITIAL SPACE methods can be used,such as with a tape measure,etc.) <br /> CAUTION 14.1.3.The deflection measurement can be obtained by using <br /> All reservoirs must be vented for proper operation. either method twice or by using each method once.Each will be <br /> described here as if that method were being used twice. <br /> 11.4.1.When the tank's interstitial space is filled with a 14.1.4.Take the initial internal-diameter measurement before <br /> monitoring fluid,the space must be vented. It is sufficient to drill backfilling the tank.(See Point 8.2.8.)In a wet-hole installation, <br /> a 114-inch-diameter hole in the side or cap of the reservoir take this measurement before the tank is placed in the <br /> standpipe as supplied by the installer. If the groundwater level excavation hole.(See Point 8.3.1.1.) <br /> could be high enough to enter a drilled vent hole,install a vent <br /> line from the standpipe to above high-water level. 14.1.5.Take other diameter measurements during the backfilling <br /> process to determine whether vertical deflection continues to be <br /> 11.4.2.When the interstitial space is dry,it is not necessary to within the limits specified by Xerxes.(See Point 6.4.6.and <br /> vent the space to atmosphere. Point 9.1.1.) <br /> 12. FILLINGTANK 14.1.6.Take the final internal-diameter measurement when the <br /> tank has been backfilled to subgrade.(See Point 13.1.6.) <br /> 12.1.GENERAL <br /> 12.1.1.Xerxes recommends only gravity filling of tanks. 14.1.7.For both methods,drive a small-headed,nonsparking <br /> nail(for example,brass)halfway into a wooden dipstick 1 inch <br /> 12.1.2.See SECTION 18, Operating Guidelines. above its base. <br /> 13. BACKFILLING TO GRADE 14.2.INTERNAL-DIAMETER MEASUREMENT WITHOUT A <br /> STANDPIPE <br /> 13.1.GENERAL 14.2.1. Place the dipstick into a service fitting. <br /> 13.1.1.Continue to take safety measures(such as placing bam- <br /> cades)around the excavation site until installation is completed. 14.2.2.Measure and record the distance from the tank bottom to <br /> the top of the fitting. <br /> 13.1.2.When the tank has been set,tested and backfilled,and <br /> all piping and venting has been completed,add the balance of .Pull the dipstick up until the exposed nail catches on the <br /> inside <br /> the backfill material. inside top of the tank. <br /> 13.1.3.The backfill must be free of debris,ice or snow.Any 14.2.4.Measure the distance from the tank top(inside)to the <br /> blocks or bricks used as support material during piping must be top of the fitting.Subtract 1 inch from this measurement and <br /> removed prior to completion of backfilling, record the distance. <br /> 14.2.5.Subtract the second distance(inside tank top to top of <br /> 13.1.4.The backfill material specified in SECTION 4 must be fitting)from the first distance(tank bottom to top of fitting). <br /> used to completely fill excavation. Record this measurement as Initial Internal Diameter on the <br /> 13.1.5.Be sure that the installation meets all of the require- Tank Installation Checklist,SECTION 4. <br /> ments of minimum cover as specified in SECTION 5. 14.2.6.For subsequent measurements of the internal diameter, <br /> 13.1.6.When the tank has been backfilled to subgrade(before repeat Points 14.2.1.through 14.2.5.When the measurement is <br /> placement of asphalt or concrete),take a measurement of the the final diameter measurement,record this measurement as <br /> internal diameter of the tank.(See SECTION 14 of the Final Internal Diameter on the Tank Installation Checklist, <br /> Installation Manual for instructions on taking diameter <br /> SECTION 4. <br /> measurements.)Record this measurement as Final Internal 14.3.INTERNAL DIAMETER MEASUREMENT WITH <br /> Diameter on the Tank Installation Checklist,SECTION 4. A STANDPIPE <br /> 13.1.7.Complete the Tank Installation Checklist. 14.3.1.Place the dipstick into a service fitting with a standpipe. <br /> 14.3.2.Measure and record the distance from the tank bottom to <br /> the top of the standpipe. <br /> 19 <br />