My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0/30/2003 11:41 2094683433 FIFTH FLOOR PAGE 03 <br /> SITE MITIGATION: <br /> a. In the event contamination is observed, confirmed or suspected as a <br /> result of a leaking UST system it is the responsibility of the owner or <br /> operator to submit a work plan to EHD Site Mitigation Unit prior to <br /> initiating any assessment or remediation activities. <br /> b. To minimize delays, a Corrective Action Flan may be submitted <br /> concurrent with tank closure or installation plans. Address one copy of <br /> the Corrective Action flan to the Site Mitigation Unit for review.For <br /> .further assistance contact the Site Mitigation Unit at(209)468-3450. <br /> B. PLAN REVIEW AND OPERATING PERMIT FEES <br /> I. New facility plan review fee of$744.00 (8 hour minimum per facility), $500.00 <br /> facility;fee(includes one tank), $125.00 per tank after the first tank,plus$10.00 <br /> state surcharge fee per tank is due at time of plan submittal plus$17.50 per site <br /> state surcharge. <br /> 2. New installation of an additional tank at an existing facility is $744.00 plan review <br /> fee(8 hour minimum per facility)plus$125.00 per new tank after first tank, and <br /> $10.00 per new tank state surcharge fee. <br /> 3. It should be noted that a$744.00 plan review check fee required for each submittal <br /> allows for up to eight(8) hours of staff review and/or inspection time. Additional <br /> time spent on plan review,meetings, inspections,phone or office consultations will <br /> be billed to the applicant at a rate of$93.00 per hour. <br /> 4. The maximum review time for UST installation plans is 40 working days. A <br /> preliminary review will be conducted by the EHD within 20 working days of <br /> submittal date to identify any gross plan deficiencies. <br /> 5. If gross deficiencies are identified,the plans will be returned with a checklist <br /> identifying plan deficiencies. <br /> 6. To expedite the review of installation plans,tirne and a half per hour overtime fee <br /> may be subnnitted to have review completed within 10 working days of submittal <br /> date if staff is available to perform the review. <br /> -2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.