My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIDE "B" (PRODUCT AND VAPOR PIPING SIDE) NOTE: d <br /> R <br /> 48" 7. PRODUCT PIPING (HARD) MUST ALWAYS PENETRATE THE DISPENSER SUMP FROM THE <br /> NOTE: ISOLATION BOOT IS NOT REQUIRED IF THE FLEX CONNECTOR OPPOSITE SIDE OF ELECTRICAL CONDUITS. <br /> IS LOCATED INSIDE A CONTAINMENT SUMP, a <br /> 24" 24 2. PLUGS ON ALL SHEAR VALVES MUST BE ACCESSIBLE. V >< <br /> LZ <br /> (8)(8) <br /> x 1 1/2" SLOTS 21 21 3. USE RIGID CLACK PIPE (INSTEAD OF HOSE) FOR VAPOR INSIDE ALL DISPENSERS. , CD to E <br /> (8) PROVIDEDED g <br /> FOR " 10 1/2 I 10 1/2" 9" <br /> DISPENSER ANCHOR BOLTS /2' at <br /> 4. INSTALL VAPOR SHEAR SUPPORT FROM BOTTOM OF SHEAR VALVE TO DISPENSER 00X. <br /> 2 1 ;� ,w 3 M Z <br /> a <br /> i" N.P.T. VAPORV d M CD <br /> no <br /> RECOVERY OUTLET _ 5 BEEN TESTED.PULL BACK EDUCERS IN DISPENSER BOXES AND SUMPS AFTER SECONDARY PIPE HAS O a H <br /> (BALA <br /> CE) <br /> STEEL ISLAND FORMca V c o f N' <br /> FRP CONTAINMENT SUMP 4" RISER V to <br /> " SCH. 40 FRP BELL X Z71 U <br /> I g" 10 1/2" � I i� 119 120 2THREADED MALE COUPLING, TESTING: ys N �,N <br /> ISOLATION BOOT ^ N <br /> - - ��J - -- -I---- - - - N FLEX CONNECTOR 2" FRP 1. TEST ALL PIPING ACCORDING TO CHEVRON STANDARD CONSTRUCTION SPECIFICATIONS ¢ M J <br /> 6" MAX. HEIGHT AT DISPENSERS TO _ 7L /— <br /> COMPLY WITH ADA REQUIREMENTS N !!! I 112 �45' ELBOW <br /> m I t \ p 2 FILL DISPENSER SUMP WITH WATER UP TO HIGHEST PENETRATION. r "' <br /> � ! — REMOVE WATER WHEN DIRECTED BY CHEVRON PROJECT MANAGER. _" °- �r �j <br /> r. ., .i <br /> • " '.• '�` - - -- - - - -- - - - 3. WHEN TESTING PRODUCT LINES, INSTALL STEEL CAP ON OPEN <br /> 4" EXTRACTOR FITTING 42 FRP 21 45' SHEAR VALVES TO AVOID DAMAGE TO THE VALVE. <br /> I �1 1 <br /> i 3 I 1' 1 1/2" NPT INLET (HIGH FEEDSTOCK) 3" X 2 FRP <br /> 1 1/2" NPT INLET LOW FEEDSTOCK)- --J/ REDUCER TEE <br /> / ( ) 6 3/4" 3" FRP 04.�Sy OLYNRcA// <br /> 11 A 1' N.P.T. RIGID PENETRATION Nq FC1 <br /> CONDUIT CONDUIT FITTINGS : �!:40� 0.,�, <br /> TAP 3 PLACES SUPREME UNLEADED 2"x2"xYo" GALVANIZEDGALVANIZED COVER ¢ kw14Na4/32448/010 <br /> NOTE, EDEDEAALE 5 <br /> _ ° <br /> 1. CONTRACTOR TO FIELD VERIFY DISPENSER BASE DIMENSIONS. COUPLING WITIi PLUG N RENEWAL �QF <br /> 2.PRODUCT ORDER SHOWN IS TYPICAL, NO OTHER VARIATIONS ARE ACCEPTABLE. SLOPE SOIL AWAY FROM <br /> CONTAINMENT SUMP � FOR TEST PORT '"YT DATE �y21,d` <br /> _-- _ 2"0 GALVANIZED PIPE <br /> ••••�..,,nn^j0rn' <br /> 7 DISPENSER ON ISLAND 4 DISPENSER BASE - DRESSER WAYNE 3/V590/U 2 PHASE II VAPOR LINE CONNECTION <br /> 1"=1'-0" 1 1/2"=1'_p" NO SCALE (3) TR CONDUIT TO <br /> ELECTRICAL AREA FOR STABILIZER BAR REVISIONS <br /> FUTURE USE, CAP REVW DATE COMMENTS <br /> INSIDE CONTAINMENT SUMP <br /> DISPENSER JUNCTION BOX (BY MFR.) SI 99125)02 Planning Commission Healing <br /> NOTE: ISOLATION ININOT REQUIRED IF THE FLEX CONNECTOR CONTAINMENT SUMP <br /> DISPENSER 65 OR fi6 _ - EXPLOSION PROOF JUNCTION BOX IS LOCATED INSIDE A CONTAINMENT SUMP. � A2 1209M3 Revised Per Health Dept Comments <br /> 36" <br /> FILTER <br /> 1 1/2"0 SCH. 40 BLACK IRON <br /> 1 1/2"MS x 2"F x 18" <br /> PIPE RISER --- <br /> ASPHALT PAVING 6" CONCRETE SLAB F.R.P. PIPE 22 <br /> 1 1/2" N.P.T. INLET UNION SEAL OFFS <br /> (BY DISPENSER MFG.) POWER DATA BASE MATERIAL <br /> R x i 90'BLACK <br /> I ,n <br /> INTERCOM IRON ELBOW <br /> CONTAINMENT SENSOR %,, .A ' ° 3" P ENETRATI B OT 0 <br /> 4 ° SCH. 40 FRP BELL X <br /> DUAL POPPET IMPACT VALVE 'd d 3" TO 2" REDUCER BOOT 2" BELL & MALE F.R.P. <br /> 1" MAXIMUM CROWN PER ADA • P . n 4" RISER THREADED MALE COUPLING. THREADED ADAPTOR <br /> (SHEAR SECTION TO BE FLUSH A • n '4 . •• d ', •4 W/ TEST PORT (ROLL <br /> WITH TOP OF DISPENSER ISLAND) 70 + 4.. + 1 e, + •° 119 120 BACK BOOT AFTER TESTING) 73 <br /> ° ` o ISOLATION BOOT NOTE; <br /> . 4 + •t ) • r o SLOPE DOWN TO TANK '` •�(»� . �(� "/ . USE APPROVED <br /> 4 I? ae < ,a • j� z� FLEX CONNECTOR 1/4" PER FT. MIN. NON-HARDENING <br /> "Me <br /> ^ 'a• ' ° 4 I ° + 4' °, d0 .'° f �� 113 JOINT COMPOUND <br /> STABILIZER BAR BASE DETAIL FOR THREADED <br /> —BRACKET EXTENSION ® ® NO SCALE CONNECTIONS. <br /> F,R.P. DISPENSER CONTAINMENT SYSTEM 68 - I SUMP PENETRATION BOOT ORO \ o <br /> FOR CONDUIT _ _zw -PEA GRAVEL <br /> 2" x 1 1/2" 90' BLACK IRON ELBOW 3/4" CONDUIT TO �m 4" EXTRACTOR FITTING FRP 90' ELBOW <br /> MONITOR SYSTEM FOR — FRP 2173 <br /> ° I CONTAINMENT SENSOR <br /> 6 1/2" 6 1/2" 6 1/2' 6 1/2" PRESSURE/VACUUM N <br /> 3/4" CONDUIT TO SALES MIN. / VENT VALVE O W • <br /> �ry AREA FOR INTERCOM CLEAR 2"NET THREADS V/ <br /> ° ° ° 4 i" CONDUIT TO CONTROL PANEL FOR , <br /> 0 1 POWER AND DATA REGULAR UNLEADED <br /> 2 1/2" MINIMUM CLEARANCE nPPRgX <br /> BETWEEN FITTING & PIPE BRACKET <br /> 31' P. <br /> V.C. PENETRATE SUMP) - - GALVANIZED <br /> 3" P.' HOR FRP PIPE OPEN AT BOTTOM. — FITTING, 2 PLACES <br /> ATTACH TO CONTAINMENT BOX <br /> F.R.P. PIPE 20 AS NEEDED FOR SUPPORT. GALVANIZED <br /> LIQUID SENSOR 88 5 PIPE TRENCH DETAIL � PHASE II VAPOR LINE CONNECTION ,. � NIPPLE, 4 PLACES <br /> 6 1/2" SUMP PENETRATION BOOT 0 1 1/2"M .. 1 1/2"MS x 18" NO SCALE kNOSCALE `�`� <br /> MINIMUM <br /> FLEXIBLE CONNECTOR 0 6" UNTGALVANIZED •� ■ <br /> CLEARANCE 3" TOT REDUCER BOOT V • ` <br /> BETWEEN WITH TEST PORT NOTE.: r� <br /> PIPE (ROLL BACK BOOT AFTER TESTING) 73 USE APPROVED NON-HARDENING BOLTS HOLD FITTING - —GALVANIZED <br /> JOINT COMPOUND 3" SECONDARY PIPE TOGETHER WHILE VENT PIPES TT <br /> NOT : MI ATE 3 TO ELBOW AS FEASIBLE FOR THREADED CONNECTIONS. RESIN CURES. l� <br /> TO ACCOMODATE FUTURE REDUCER BOOT ACCESS <br /> PRODUCTGRADE 2" BELL & MALE F.R.P. •"• <br /> MANIFOLD DETAIL <br /> NO SCALE O <br /> THREADED ADAPTOR <br /> 3" MINIMUM INSERTION APPLY ADHESIVE TO FLANGE OVERALL DIMENSION [,j • {,� <br /> OF CONTAINMENT PIPE DETERMINED BY NUMBER VV// <br /> OF RISERS AND/OR <br /> INTO CONTAINMENT 1/2" MINIMUM CLEARANCE BETWEEN LOCAL CODE. MANIFOLD VENT PIPES <br /> FITTING REQUIRED. CLAM SHELL FITTINGS (TYP.) <br /> DISPENSER PRESSURE VACUUM VALVE /" 12'-0" ABOVE GRADE <br /> 36" AS REQUIRED BY LOCAL CODE. <br /> GENERAL CONTRACTOR TO PROVIDE 1/4" BEVEL BUTT -- OVERFILL ALARM <br /> RIGID PIPING TO EACH VAPOR RECOVERY 2" PRIMARY PIPE TO \� 3" F.R.P. 45' ELL WELD-SMOOTH. & SWITCH y7 98 •� <br /> MANIFOLD BE TESTED PRIOR TO <br /> STABILIZER BAR SEALING SECONDARY •� <br /> AL <br /> 1 1/2" x 1' OFF DUAL POPPET PIPE / — 3" F.R.P. NIPPLE PAINT DARK VAPOR SHUTOFF VALVE . ` O O <br /> (SHEAR SEC TON 70 BE FLUSH GY-210 - V <br /> NOTE, GALVANIZED <br /> OF DISPENSER ISLAND) 71 CONTAINMENT FITTING / 3" F.R.P. TEE 2" 0 SCH. 40 •_ //.. <br /> GALVANIZED PIPES 40 <br /> 1. MOUNT VAPOR SHUTOFF VALVE USING PHIL-TITE 6 FASTEN VENT (� <br /> 1" MAXIMUM CROWN PER ADA /2" / ----- 3" F.R.P. PIPE TYP. (PRIMED AND WRAPPED z RISERS SECURELY Y <br /> VAPOR IMPACT VALVE SUPPORT KIT. ( ) <br /> °; +'• ° •, <br /> ON. BELOW NT GRADE) TO FRAME WITH <br /> • +a 6 I PAINT DARK GRAY o PRE-FORMED <br /> •4• a „ • /2" GY-210 <br /> 4 +. • . . 9 8 .° ° ,4.° a, MIN. / iv UNISTRUT BRACKETS. - <br /> °• ,d4 2"x2"xi 4" GALVANIZED i•""� <br /> .8 •• PIPE SUPPORT 26 THREADED FEMALE x x .n <br /> COUPLING WITH PLUG V' <br /> FOR TEST PORT 71" <br /> 2" X 1 1/2" 90' / `° `o TYP, <br /> BLACK IRON <br /> ELBOW ;� '' 7■,i\• <br /> 6" MINIMUM PEA GRAVEL <br /> COVER OVER F.R.P. PIPE <br /> 9 1/2:"M5 x. Z"F x 18° 1� / <br /> 12" 0 CONCRETE �A■ � `V <br /> FOOTING, SLOPE o �,/ N NOTE AT TOP (TYP.) F� <br /> — — — USE /APPROVED NON-HARDENING •+ -,1.: -42 <br /> JOINT COMPOUND FOR THREADED PRODUCT,VENT,VAPOR PIPING <br /> CONNECTIONS. / ,, ASN DISPENSER DETAILS <br /> 3"m F.R.P. VAPOR RECOVERY PIPE 20 2" BELL & MALE F.R.P. ro DCI PROJECT NUMBER A01.026.03 <br /> THREADED ADAPTOR CONTAINMENT SUMP, <br /> DRAWN: JM CHECKED: IQ <br /> 12 DATE: 051010 APPROVED: JA <br /> SEE DETAIL ABOVE SUMP PENETRATION BOOT 0 <br /> 2 ..YrSYCLh(��-xCrYrSrCL/i(11� 5`>{Lli()Qv <br /> 3" TO 2" REDUCER BOOT NOTE: DO N01 LOCATE VENT RISERS WITHIN: SCALE: AS NOTED <br /> WITH TEST PORT SLOPE PIPING TOWARD ALL CROSS OVER PIPING TO BE <br /> ROLL BACK BOOT AFTER TESTING) 73 UNDERGROUND FUEL MADE WITH TEE (OR 90' ELL), - BUILDING OR BUILDING COLUMNS <br /> (ROLL <br /> MI AT 3 PI G 70 ELBOW AS FEASIBLE STORAGE TANKS AT SHORT NIPPLE AND 45' ELL. - 5'-0" OF ELECTRIC LIGHTS, SIGNS OR. <br /> TO ACCOMODATE FUTURE REDUCER BOOT <br /> NNECTIONGRADE <br /> AND PIPING HARD RECOVERY <br /> 1/4" PER FOOT MINIMUM. OTHER SOURCES OF IGNITION F=4 <br /> $ DISPE S CO (HARD) 6 PIPING CROSSOVER DETAIL VENT RISER DETAIL <br /> NO SCALE NO SCALE NO SCALE SHEET NUMBER <br />
The URL can be used to link to this page
Your browser does not support the video tag.