My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 10:41:34 PM
Creation date
2/27/2020 3:48:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.3,2.The total length of the slab must be at least the same as 6.5.HARDWARE AND ANCHORING POINTS <br /> the length of the tank. 6.5.1.Anchoring hardware must be sized according to TABLE 6-3, <br /> 6.3.3.The minimum slab thickness is 8 inches. and manufactured to industry standards and dimensions. <br /> 6.3.4.The width of the slab depends on the tank diameter.The Tank Minimum Turnbuckle Diameter Minimum <br /> slab must extend a minimum of 18 inches[12 inches for 4-foot- Diameter (by Type) Wire-Rope <br /> diameter tanks]beyond each side of the tank. Hook Jaw Eye Diameter <br /> 6.3.5.Refer to TABLE 6-2 and FIGURE 6-1 for anchor-point 4' 3/4" 112" 1/2" 3/8" <br /> dimensions. 6' 3/4" 1/2" 1/2" 3/8" <br /> Tank Anchoring Dimensions 8' 1 1/4" 3/4" 3/4" 1/2" <br /> Diameter <br /> "E" "E" 10' 11/4" 3/4" 3/4" 1/2" <br /> "A" "B" "C" "D" Min. Max. <br /> 12' 11/4" 3/4" 3/4" 1/2" <br /> 4' 24" 18" 12" 8'-41/4,, 27" 30" <br /> 6' 35" 1 23" 13" 12'-1" 42" 48" TABLE 6-3 <br /> 8' 43" 31" 15" 15'-1" 52" 58" 6.5.2.The installing contractor is responsible for providing <br /> 10' 57" 45" 15" 18'-8 3/4" 69" 75" hardware and anchor points of sufficient size and strength. <br /> 6.5.3.The particular configuration of hardware will be determined <br /> 12' 58" 50" 23" 22'-6 314" 87" 93" by the contractor,the owner or the owner's representative. <br /> TABLE 6-2 6.5.4.Locate the anchor points as shown in TABLE 6-2 and <br /> 6.3.6.Provide a separate anchor point for each hold-down strap. FIGURE 6-1.Refer to dimension"E."Align all anchor points with <br /> the marked arrowhead symbols ►t on the tanks,within a <br /> 6.3.7.All anchor points must be engineered to withstand the tolerance of t1 inch. <br /> tank's buoyancy forces. <br /> 6.5.5. For specific information on hardware and its use,consult <br /> 6.3.8.When using a concrete base slab,allow sufficient depth in the hardware manufacturer or supplier. <br /> the excavation for 12 inches of bedding material below the tank. <br /> (See FIGURE 6-1.) 6.5.6.The installer is responsible for using appropriate and ap- <br /> proved engineering practices when fastening wire rope.Refer to <br /> 6.4.HOLD-DOWN STRAPS recommendations of wire-rope manufacturer and supplier,and <br /> 6.4.1.Only Xerxes straps may be used when anchoring a follow accepted industry standards when selecting,using, <br /> Xerxes tank. attaching or connecting wire rope. (See FIGURE 6-3, FIGURE <br /> 6-4 and FIGURE 6-5.) <br /> 6.4.2.The locations for hold-down straps on each tank are <br /> marked on the tank by the arrowhead symbols►t . A CAUTION <br /> 6.4.3.Straps must be used on all marked hold-down locations. Use only appropriately sized hardware with the strap eye. <br /> Oversized hardware may damage the strap eye and result in <br /> CAUTION minor or moderate injury.See FIGURE 6-2 for dimensions of <br /> Do not place straps between ribs(except on 4-foot-diameter strap eye. <br /> tanks).Failure to properly place straps may result in tank 3 1/4" <br /> damage. <br /> Strap <br /> 6.4.4. Data for hold-down straps are given in TABLE 6-2 and Clips <br /> FIGURE 6-1. <br /> 1 318" <br /> 6.4.5.Evenly distribute loads by tightening all hold-down straps <br /> uniformly until they are snug over the ribs but cause no <br /> deflection of the tank. <br /> FIGURE 6-2 <br /> 6.4.6.Take a measurement of the internal diameter of the tank to <br /> determine whether vertical deflection is within the limits specified 6.5.7.When connecting the end of a hold-down strap to the <br /> by Xerxes after the straps have been installed and tightened. anchor,common methods(shown in FIGURE 6-3)are:A.)using <br /> (See SECTION 14 of the Installation Manual for instructions on a drop-forged turnbuckle. B.)using a looped wire rope,or <br /> taking diameter measurements.) C.)using a combination of both. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.