Laserfiche WebLink
Stantec <br /> Quarterly Status Summary Report—First Quarter 2012 <br /> Stockton Charter Way Commingled Plume <br /> April 20, 2012 <br /> Recent Correspondence <br /> The CRWQCB-CVR commented on the Pilot Test Report dated February 15, 2012 and <br /> approved Stantec's recommendation to submit a corrective action plan (CAP) for AS/SVE in a <br /> letter dated February 16, 2012. <br /> This Quarter's Activities (First— 2012) <br /> 1. Stantec prepared and submitted the Semi-Annual Groundwater Monitoring Report — <br /> Fourth Quarter 2011 on January 27, 2012. <br /> 2. Stantec prepared and submitted the Pilot Test Report on February 15, 2012. <br /> Next Quarter's Activities (Second— 2012) <br /> 1. Blaine Tech Services, Inc. of Sacramento, California will perform the 2Q12 semi-annual <br /> groundwater monitoring and sampling event. <br /> 2. Stantec will design a AS/SVE system for the Chevron site. <br /> 3. Stantec will present the AS/SVE design in front of Chevron's RSRT Technical Peer <br /> Review Team for review and comment. <br /> 4. Stantec will prepare a Corrective Action Plan documenting the proposed AS/SVE system <br /> design as proposed in the Pilot Test Report dated February 15, 2012. <br /> Stockton Charter Way Commingled Plume QSSR 1Q12.doc 3 <br />