My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_MONTHLY STATUS REPORT - APRIL 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1444
>
2900 - Site Mitigation Program
>
PR0527031
>
ARCHIVED REPORTS_MONTHLY STATUS REPORT - APRIL 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2020 11:37:44 AM
Creation date
2/28/2020 8:44:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
MONTHLY STATUS REPORT - APRIL 2013
RECORD_ID
PR0527031
PE
2957
FACILITY_ID
FA0018318
FACILITY_NAME
FORMER COLUMBO / TOSCANA BAKERY
STREET_NUMBER
1444
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16503005
CURRENT_STATUS
01
SITE_LOCATION
1444 S LINCOLN ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 5 <br /> Air Sparge System = Operational Data <br /> Chevron Facility #92033 = Stockton Charter Way Commingled Plume Site <br /> 508 W Dr, Martin Luther King Jr. Blvd , Stockton, California <br /> Hour Period Cumulative Compressor After Cooler Total Manifold Pressure (P) in psi and Flow (Q) in scfm <br /> Date Notes Meter Uptime Uptime P T P T Flow AS-1 AS-2 AS-3 AS-4 AS-5 AS-6 AS-7 AS-8 AS-9 AS-10 AS-11 AS-12 <br /> Reading N (%) (psi) ('F) (psi ) (° F) (scfm) P Q P Q P Q P Q P Q P Q P Q P Q P Q P Q P Q P Q <br /> 03/07/13 0.0 - - - -- - - - 26.5 24.0 16.0 23.0 22.0 25.0 18.0 17.0 16.0 10.0 19.5 6.0 19.0 12.0 21 .0 13.0 23.0 9.0 24.5 8 .0 24.5 4.0 24.0 4.0 <br /> 04/26/13 37.0 - - 17 228 16.5 87 52 17.5 11 17 6 12 8 17 9 20.5 <4 13.5 <4 16.5 9 10.5 5 14.3 5.5 18.3 <4 16.8 6 19 4 <br /> 05/03/13 204 99% 99% 20 271 20 110 55 20.5 22.0 15.5 16.0 14.5 21 12.8 16.0 19.0 8.0 20.0 7.8 16.5 15.8 22 7 22 12 212 8.3 19 12.4 22.0 <4.0 <br /> 05/06/13 a 208 6% 71 % 25 227 23.5 90 44 15.7 20 14.0 11 14.2 16 12.5 12 17.0 5 16.5 8.0 15.5 9.8 21 .0 <4 20.2 7.5 15.6 7 15.2 11 17.0 <4 <br /> 05/08/13 b 230.0 46% 67% - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> 05/09/13 254 100% 70% 19 230 17.8 89 45 15.3 22.8 11 .6 12 11 14.7 10 12.5 14.8 5.8 12 8 13 12 15.8 <7.6 15.2 9.2 15.4 8.8 15.4 7.5 16.4 <4 <br /> 05/16/13 c 392.0 82% 74% - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> Summary Period: May 2013 (April 26, 2013 through May 24, 2013) <br /> Minimum: 19 227.0 17.8 89.0 44 15.3 20.0 11 .6 11 .0 11 .0 14.7 10.0 12.0 14.8 5.0 12.0 7.8 13.0 9.8 15.8 4.0 15.2 7.5 15.4 7.0 15.2 7.5 16.4 4.0 <br /> Average: 21 242.7 20.4 96.3 48 17.2 21 .6 13.7 13.0 13.2 17.2 11 .8 13.5 16.9 6.3 16.2 7.9 15.0 12.5 19.6 6.2 19. 1 9.6 17.4 8.0 16.5 10.3 18.5 4.0 <br /> Maximum: 25 271 .0 23.5 110.0 55 20.5 22.8 15.5 16.0 14.5 21 .0 12.8 16.0 19.0 8.0 20.0 8.0 16.5 15.8 22.0 7.6 22.0 12.0 21 .2 8.8 19.0 12.4 22.0 4.0 <br /> Fracture Pressure: 28.5 118.3 125.6 24.8 22.6 20.4 120.4 22 23.4 24.8 20.4 24. 1 <br /> Period Hours Operated: 355 <br /> Period Uptime Percent: 74% (Planned) <br /> Cumulative Hours Operated: 392 <br /> Cumulative Uptime Percent: 74% (Planned) <br /> AS System Specifications: Products Recovery Management AS with 15-hp, 60 scfm at 30 psi rotary claw air compressor <br /> Abbreviations: <br /> psi = pounds per square inch <br /> OF = Degrees Fahrenheit <br /> scfm = Standard cubic feet per minute <br /> P = Pressure <br /> T = Temperature <br /> Q = Flow <br /> - = Well not measured or valve closed. <br /> Notes: <br /> - Fracture Pressure = 0.73 X depth in feet below surface to top of well screen <br /> - AS system was operated on 4/9/2013 and 4/19/2013, but no system data parameters were recorded. <br /> - Sparge schedule in military time as of 4/26/2013: AS-1 , AS-10, A&1 1 , AS-12 (00-04 and 12-16); AS-3, AS-6, AS-8, AS-9 (04-08 and 16-20); and AS-2, AS-4, AS-5, AS-7 (08-12 and 20-24) <br /> a = System shutdown due to aftercooler high temperature alarm. The air compressor variable frequency drive was adjusted from 60 to 45 hertz. <br /> b = System shutdown due to an SVE system alarm. Hour meter reading was back calculated. <br /> c = System shutdown due to an SVE system alarm. Oil was found on air compressor exhaust vent, which may indicate a leak in shaft seal. Restarting the AS system is pending manufacturer inspection/repair under warranty. <br /> 92033 Remediation Workbook.xlsx Page 1 of 1 Sfantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.