Laserfiche WebLink
Phase II Work Plan <br /> 20 E.Lindsay St. <br /> Page 3 <br /> contamination will be analyzed for SVOCs by EPA Method 8270C and CAM 17 Metals by EPA <br /> Methods 6010B and 7417A. <br /> 4. REPORTING <br /> Condor will prepare the Limited Phase H Environmental Site Assessment Report detailing the findings of <br /> the investigation to be submitted to the SJCEHD and the City of Stockton, Department of Housing and <br /> Redevelopment. The report will include a discussion of the field and laboratory procedures used to <br /> conduct the investigation,a discussion and presentation of the analytical results,and recommendations. <br /> 5. PROJECT SCHEDULE <br /> Upon approval of this work plan by the SJCEHD and acquisition of the boring permit,the field portion of <br /> the investigation is scheduled for June 10, 2004. A report can be submitted to the SJCEHD by July 30, <br /> 2004. If you need additional information or have any questions, please call Alex Dewitt at (209) 234- <br /> 0518. <br /> Respectfully submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> Alex Dewitt,R.G.#7502 <br /> Associate Geologist <br /> P:\4000_pq\4392 City of Stockton\Reports\Work Plans\4392 Phase 11 WP.doc <br />