My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 9:13:35 AM
Creation date
2/28/2020 1:04:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP D1) Get your injection syringes and your adhesive kits ready. See Page 4 or 9. <br /> The amount of adhesive shown on the Adhesive chart on page 8 must be measured and <br /> injected into EACH port on the fitting. Each fitting has two ports. One inside and one outside. <br /> STEP D2) Mix your approved adhesive kit with the provided fiberglass filler. Load your syringe <br /> by placing the tip in the can of mixed adhesive and drawing it up. PURGE THE AIR FROM THE <br /> SYRINGE TIP (Pg. 9) <br /> STEP D3) Quickly inject the adhesive into the Adhesive Injection Port, which is located at the top <br /> of each fitting body. The paste should flow into the interior channel and seep out along the conduit. <br /> (Fig. D3) <br /> DO NOT ATTEMPT TO INJECT BOTH SIDES AT ONCE <br /> INJECT INJECT <br /> ADHESIVE ADHESIVE <br /> OUTSIDE INSIDE <br /> F I RSTSECOND Adhesive <br /> Injection <br /> ' f complete <br /> Fig. D3 <br /> USE ONLY ROBROYTM PVC-COATED CONDUIT <br /> or any brand hot-dip galvanized conduit <br /> bead with bead with <br /> gloved finger gloved finger <br /> Outside of Sump Inside of Sump <br /> STEP D4) Run adhesive around the joints and bead with a gloved finger and let cure. (Fig D3) <br /> JAN 2 5 2018 <br /> 10 ii-F-Series-1 X-SS-11 A <br /> ENVIRONMENTAL HEALTH <br /> DEQ AI;T,MENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.