My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 9:13:35 AM
Creation date
2/28/2020 1:04:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209) 468-3433 Web:www.sjgov.org/ehd <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Phone: Date: <br /> WEST VALLEY AUTO SERVICE LLC (209) 836-3464 June 28, 2017 <br /> Facility Address: CERS ID: <br /> 2615 W GRANT LINE RD, TRACY, CA 95304 10184725 <br /> Inspection Contact: Title: Phone: <br /> Waise Hakimi I Manager (209) 836-3464 <br /> Inspection Type: Program: <br /> INSPECTION/REINSPECTION 1 hr minimum 2371 - UST FACILITY- 1702 COMPLIANT <br /> Consent For: I Consent Given By: <br /> 0 Inspection 0 Photos 0 Sam les I Waise Hakimi, Manager <br /> Service Technician Onsite: Exp.Date: Designated Operator: Exp.Date: <br /> Aneil Chand 06/04/2018 <br /> Service Technician Manufacturer's Training <br /> Veeder Root, 03/02/18, VMI, 02/09/18 <br /> CCR=California Codeo egu ations HSC=Health and Safety Code CFR=Codeo a era Regulations <br /> V=Violation R=Repeat violation COs=Corrected on site during inspection <br /> File Review <br /> 101 HSC 25284 No permit to operate ❑V ❑R ❑COS <br /> 102 HSC 25284(a)(3) No written agreement between tank owner and tank operator to monitor the tank system ❑V ❑R ❑COS <br /> 103 HSC 25292.2 Current financial responsibility documents not submitted ❑V ❑R ❑COS <br /> 104 CCR 2711 UST operating permit application for facility and tank information not submitted or current ❑V ❑R ❑COS <br /> 105 CCR 2632(d)(1) Failed to have an approved UST monitoring plan ❑V ❑R ❑COS <br /> 106 CCR 2632(d)(2) Failed to have an approved UST response plan ❑V ❑R ❑COS <br /> 107 CCR 2632(d)(1)(C) Plot plan/site map not submitted or failed to completely show where monitoring is performed ❑V ❑R ❑COS <br /> 108 CCR 2637(f),2638(e) Failed to notify the EHD 48 hours prior to conducting testing ❑V ❑R ❑COS <br /> 109 CCR 2637 Failed to test secondary containment ❑V ❑R ❑COS <br /> 110 CCR 2637(e) Failed to submit secondary containment test report within 30 days ❑V ❑R ❑COS <br /> 111 CCR 2638(a) Failed to test monitoring and leak detection equipment annually ❑V ❑R ❑COS <br /> 112 HSC 25284.2 Failed to test spill containers annually ❑V ❑R ❑COS <br /> 113 CCR 2638(d) Failed to submit monitoring system certification test report within 30 days ❑V ❑R ❑COS <br /> 114 CCR 2636(f) Failed to perform 0.1 gph annual line test for pressurized piping without fail safe or shut down ❑V ❑R ❑COS <br /> 115 CCR 2715(a) Failed to inform the EHD of designated operator identification or change within 30 days ❑V ❑R ❑COS <br /> 116 CCR 2715 Designated operator,service tech or installer did not possess current ICC certification ❑V ❑R ❑COS <br /> 117 CCR 2663 Failed to inspect a lined or repaired steel tank within 10 years of lining and every 5 years after ❑V ❑R ❑COS <br /> 118 CCR 2663 Failed to submit tank lining certification within 30 days or to conduct proper tests ❑V ❑R ❑COS <br /> 119 HSC 25299 Documents were falsified or misrepresented ❑V ❑R ❑COS <br /> 120 CCR 2635(d) Failed to submit UST Certification of Installation/Modification ❑V ❑R ❑COS <br /> 121 CCR 2712(f) Failed to submit a written response within 30 days of receiving an inspection report ❑V ❑R ❑COS <br /> 122 CCR 26310) Failure to submit UST system component statement of compatibility for substance stored ❑V ❑R ❑COS <br /> On Site Records <br /> 201 CCR 2712(b) Failed to maintain alarm logs and/or records of follow up actions ❑V ❑R ❑COS <br /> 202 CCR 2712(b) Failed to maintain cathodic protection test records on site for at least 6 1/2 years V ❑R ❑COS <br /> 203 CCR 2712(b) Failed to maintain records of monitoring, repair,lining,and upgrades on site V ❑R ❑COS <br /> 9171 9690 0935 0131 4336 99 FA0014623 PRO521537 SC333 06/28/2017 <br /> EHD 23-01 Rev.09/22/16 Page 1 of 4 Underground Storage Tank Program OIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.