Laserfiche WebLink
Monitoring System Certification <br /> A Results of Testing/Servicing <br /> Software Version Installed: <br /> Com lete the following checklist: <br /> rYe <br /> ❑ No* Is the audible alarm operational? <br /> ❑ No* Is the visual alarm operational? <br /> ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) <br /> K N/A operational? <br /> IN Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate,or is electrically discqgnecteV If yes:-which sensors initiate <br /> positive shut-down? (Check all that apply)/[Sump/Trench Sensors;A Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnectionWYes; ❑No. <br /> KYes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigge . <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; A Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: RECEIVED <br /> MAR 14 2016 <br /> ENVIRONMENTAL <br /> . n.f...�r.-p nom-.• n <br /> wkwn Ones <br /> UN-036—316 www.unidomo <br /> rg Rev.01/17!08 <br />