Laserfiche WebLink
SWRCB,January 2002 Pagc of <br /> 1. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 11 <br /> , Spill/Overfill Containment Boxes are Present; but were Not Tested : I <br /> Test Method Developed lay 1.1 Spill Bucket Manufacturer X Industry Standard Professional Enginee-- r <br /> ❑Other(Spec) <br /> 'fest Method Used: ❑Pressure n Vacuum X Hydrostatic <br /> _ ❑Other(Spec) _ <br /> 1•est Equipment Lysed; Equipment Resolution: <br /> Spill Boz#91 Spill Box# DSL Spill Box# 87 Spill Box# <br /> Bucket Diameter: 1 1" till <br /> 1 L" <br /> Bucket Depth: 13" 13" 14" <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: _ <br /> "rest Start Time: 2:00 PM 2:00 PM 2:00 PM <br /> Initial Reading(Ri): 10.0" 10.0" 10.0" <br /> Test End Time: 300 PM 3:00 PM 3:00 PM _ <br /> Final Reading(RF): 10.0" 10.0" 10.0" <br /> Test Duration: 1 hour I hour 1 hour <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or 008 008 008 <br /> Criteria: <br /> Test Result: X Pass ❑Frail X Pass 0 Fail X Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to lesling, anti recon)iirendecifolloii,-up forJailecl tests) <br /> PHIL-TITS SPILL BUCKETS <br />