Laserfiche WebLink
SWRCB,January 2002 Page of' <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure E Vacuum n Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used:Hydrostatic Equipment Resolution:0.00" <br /> Spill Box# 87 V Spill Box# 91 V Spill Box# Spill Box# <br /> Bucket Diameter: 12.00" 12.00" <br /> Bucket Depth: 14.00" 14.00" <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min <br /> starting test: <br /> Test Start Time: 10:00am 10:00am <br /> Initial Reading(Rl): 11.25" 10.75" <br /> Test End Time: 11:00am 11:00am <br /> Final Reading(RF): 11.25' 10.75^ <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0.00^ 0.001, <br /> Pass/Fail Threshold or 0.002" 0.002" <br /> Criteria: <br /> Test Result: �' Pass Fail Pass Fail Pass Fail Pass _ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> All other spill buckets tested during Monitoring Certification same day please see results. <br />