My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2615
>
2300 - Underground Storage Tank Program
>
PR0521537
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2020 9:13:35 AM
Creation date
2/28/2020 1:04:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0521537
PE
2371
FACILITY_ID
FA0014623
FACILITY_NAME
WEST VALLEY AUTO SERVICE LLC
STREET_NUMBER
2615
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21229017
CURRENT_STATUS
01
SITE_LOCATION
2615 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
476
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of' <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Spec) <br /> Test Method Used: Pressure E Vacuum n Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used:Hydrostatic Equipment Resolution:0.00" <br /> Spill Box# 87 V Spill Box# 91 V Spill Box# Spill Box# <br /> Bucket Diameter: 12.00" 12.00" <br /> Bucket Depth: 14.00" 14.00" <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min <br /> starting test: <br /> Test Start Time: 10:00am 10:00am <br /> Initial Reading(Rl): 11.25" 10.75" <br /> Test End Time: 11:00am 11:00am <br /> Final Reading(RF): 11.25' 10.75^ <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0.00^ 0.001, <br /> Pass/Fail Threshold or 0.002" 0.002" <br /> Criteria: <br /> Test Result: �' Pass Fail Pass Fail Pass Fail Pass _ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> All other spill buckets tested during Monitoring Certification same day please see results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.